The main causes are as follows: 1. The structure is unreasonable, the welding seam is concentrated and the welding joint stress is too large. 2. When welding, the molten pool is too large and overheated, and the alloy is burnt too much. 3. The arc crater is not filled due to too fast arc closing and too early wire drawing. 4. Material problems, for example, when Mg content is less than 3%, and impurities such as Fe and s exceed the standard, it is easy to cause cracks. When the melting temperature of welding wire is too high, liquefaction cracks in heat affected zone are easy to occur. Preventive measures include: 1. During the design, attention should be paid to the reasonable arrangement of welding seams, avoiding the stress concentration as far as possible, and selecting the welding sequence reasonably. 2. Reduce welding current or increase welding speed properly. 3. The arc stopping operation technology should be correct, and the arc pit should be filled by adding the ou
Feb 18, 2025
1. It is easy to produce air hole when the flux is wet 2. If the welding speed is too fast, it is easy to produce welding porosity 3. Welding gas hole caused by welding wire rust or oil stain 4. The welding seam has rust, oxide film, grease and other organic impurities, resulting in welding porosity 5. It is easy to produce air hole when welding with improper polarity 6. Welding porosity caused by flux contamination 7. Insufficient height of flux is easy to produce welding porosity 8. If the height of flux is too high, the gas is not easy to escape and the welding porosity is easy to be produced
Feb 10, 2025
With the continuous development of air separation plant manufacturing technology and the popularization and application of new equipment and process, the process of air separation plant has become increasingly mature and gradually reached the international level. The large-scale air separation plant is bound to bring a high increase in energy consumption. Energy saving and consumption reduction of air separation plant through advanced technology and equipment has become an important means for large-scale air separation users to reduce the operating costs of air separation plants and improve economic benefits.
Jan 23, 2025
1. When working at a height of more than 2 meters or multilevel cross operation, special personnel shall be assigned to guard or contact with each other, and it is strictly forbidden to command by more than one person. 2. The safety belt must be worn when working at a height of more than 2 meters, and it should be hung high and low. It is forbidden to hang the safety belt on the maintenance objects, on the pipelines and equipment (including electrical) of various dangerous media, and it is forbidden to drag the safety belt on the ground. It is strictly forbidden to use nylon material safety belt in high-temperature area or welding operation, and the flame-retardant and high-temperature resistant safety belt should be selected. 3. If there are high falling objects, the articles should be cleaned up in time, or the falling prevention measures should be added. 4. The safety rope should be lowered from the top of the silo as the hanging point of the safety belt for the high-altitu
Jan 15, 2025
1. According to the specific situation of the construction, formulate the fire protection scheme, establish and improve the fire safety system, and strictly abide by the operation rules. 2. Flammable and explosive materials such as paint and thinner shall not be stored in the project site. 3. The construction unit is not allowed to set up seasoning room in the project, and is not allowed to carry out paint allocation in the project. 4. No smoking is allowed in the construction site. A fire permit shall be issued and a special person shall be assigned to supervise the operation. 5. The operation site should be equipped with sufficient fire-fighting equipment. 6. During the construction period, the use of various open fire operations in the project shall be approved by the safety and environmental protection department of the construction unit, and sufficient fire-fighting materials and fire-fighting equipment shall be provided.
Jan 07, 2025
With the development trend of large-scale air separation plant, the column support of its matching cold box equipment tends to be large-scale. The traditional support structure has complex structure and poor bearing capacity. Through the use of finite element analysis software, DEAR air separation carries out finite element analysis and optimization on the commonly used experienced column of air separation plant, so as to improve the bearing capacity of support and reduce the processing difficulty, to reach the purpose of saving material cost.
Dec 27, 2024
Pressure swing adsorption and temperature swing adsorption of molecular sieve
Dec 19, 2024
1. The requirements of molecular sieve adsorber, electric heater and other equipment in place are the same as those of air cooling column of pre cooling system. 2. Process piping shall be constructed in strict accordance with relevant specifications and design and construction drawings. 3. The air tightness test shall be conducted before the valve is installed, and the test pressure and inspection standard shall be carried out according to the technical requirements of corresponding valves. 4. Pay attention to the direction of switch valve installation. V1201, V1202, V1207 and V1208 are front mounted valves, while V1203, V1204, V1205 and V1206 are reverse mounted valves. When the switch valve is installed, its shaft should be in a horizontal position, and the flange bolts should be evenly cross tightened. 5. The pipeline of pressure equalizing valve V1209 should have compensating bend.
Dec 11, 2024
The principle of expander with motor brake in air separation plant is to control the speed of expander by braking torque generated by motor generator braking state. Once the brake motor fails, the expander speed will lose control and overspeed will occur. At this time, it is necessary to automatically open the protection and control system. The principle is that the speed measuring motor will send out the overspeed signal to cut off the three-way solenoid valve. The three-way solenoid valve directly controls the air open pneumatic butterfly valve at the inlet of the expander, so that the butterfly valve is quickly closed and the air inlet is cut off. At the same time, the rotation of the valve rod touches the stop and limit switch, so that the power supply of the expander motor is cut off and the safe shutdown is realized.
Dec 03, 2024
In the operation of air separation plant, in order to ensure the accuracy of DCS control system monitoring and the safety and stability of operation, it is necessary to do well of DCS system grounding.
Nov 25, 2024
The upsizing of air separation plant has became an inevitable trend of the development of national economy. A few years ago, the domestic air separation industry had achieved the air separation performance of 100000 m³/h level, and there were more than 150000 m³/h air separation plant abroad. With the gradual increase of the scale of air separation plant, its energy consumption is also increasing. In order to save energy, reduce consumption and reduce pollution, it is of great significance to study the driving mode of compressor for large-scale air separation plants. 1. Turbine drive: Steam turbine is widely used in electric power, chemical industry, metallurgy and other industries and fields because of its axisymmetric high-speed rotation characteristics, smooth operation, small wear and long continuous operation time. However, the one-time investment of steam turbine drive is relatively large, and the requirements for heat supply pipeline and production system are high. The pla
Nov 15, 2024
In order to check the installation quality, deformation under low temperature and smooth condition of pipelines, valves and field installed air separation plant in air separation column, needs to be further tighten the flange bolts at low temperature. It is necessary to start freezing before filling the cold insulation box with cold insulation material, which is called naked cooling. During naked cooling, the rectification column, main condensing evaporator and other main equipment shall be cooled to the minimum temperature for 2 hours respectively, and then the whole air separation unit shall be cooled for 3 to 4 hours. The deformation and leakage of each part shall be checked in detail, and the flange bolts shall be tightened again. After defrosting, the flange shall be heated to normal temperature before gas seal test can be conducted.
Nov 07, 2024
1 2 3 4 5 6 7 8...24
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top