1.Adhere to the electrical professionals to work with certificates, non electrical professionals are not allowed to replace or repair any electrical components.

 

2.Establish the temporary electricity inspection system, inspect and irregularly inspect various lines and facilities on site according to the temporary power management regulations, and archive the inspection and spot check records.

 

3.The inspectors and operators must wear insulating rubber shoes and gloves according to the regulations; they must use special insulating tools for electricians.

 

4.The temporary distribution lines must be erected according to the specifications. The overhead lines must be insulated wires, plastic flexible wires, bundles of overhead laying and surface laying along the ground.

 

5.The erection and use of temporary electricity on the construction site must comply with the provisions of technical code for safety of temporary electricity on construction site (JGJ46-88).

 

6.Construction machinery, vehicles and personnel shall keep a safe distance from the line. When the specified minimum distance is not reached, reliable protective measures must be taken.

 

7.The distribution system must implement hierarchical distribution. The internal setting of all switch boxes in the site must comply with the relevant regulations. The electrical appliances in the box must be reliable and intact. The type selection and setting value of the switch box should comply with the relevant regulations. The switch appliance should be marked with the purpose. The electrical system in the switch box shall be of uniform style and configuration. The box shall be painted orange, and fence and protective shed shall be set according to the regulations. The connection between the flow box and the upper level switch box shall be external connection (all electric boxes must use the products approved by the designated manufacturer).

 

8.All distribution boxes on the construction site shall be marked with the name of the box, the title, number and purpose of each control line.

 

9.The cables and wires in the distribution lines, distribution boxes and switch boxes shall be well insulated to the ground, and there shall be no damage, hard injury, exposed elevator, wire extrusion, corrosion, leakage and other hidden dangers, so as to prevent sudden accidents.

 

10.The independent power distribution system must adopt the three-phase five wire zero connection protection system, and the non independent system can adopt the corresponding zero connection or grounding protection mode according to the actual situation on site. All kinds of metal base and electrical equipment must be grounded according to the regulations.

 

11.While adopting grounding and zero connection protection methods, two-level leakage protection devices must be set to implement hierarchical protection to form a complete protection system. The selection of leakage protection device shall meet the requirements.

 

12.In order to ensure the on-site lighting is not interrupted in case of fire and other emergencies, the power switch and lighting switch in the distribution box must be used separately.

 

13.The switch box shall be distributed by the distribution box. It should be noted that one switch can control more than two electrical equipment. Each equipment should have its own switch box. It is forbidden to control more than two electrical equipment (including sockets) with one switch to ensure safety.

 

14.There should be enough space and passageway for two people to work at the same time around the distribution box and switch box. It is not allowed to stack building materials and sundries beside the box.

 

15.All kinds of high and high facilities must be equipped with lightning protection devices according to the regulations.

 

16.The distance between the distribution box and the switch box shall not exceed 30 meters; the convergence of the switch box and the electrical equipment controlled by it shall not exceed 3 meters.

 

17.The use of electric tools shall comply with the relevant provisions of national standards. The power line, plug and socket of the tool shall be in good condition. The power line shall not be lengthened or replaced arbitrarily. The external insulation of the tool shall be intact. Special personnel shall be responsible for the maintenance and storage.

 

18.The construction site lighting generally adopts the 220V power supply lighting. During the structural construction, the pipe should be embedded in the roof construction. The temporary lighting and power supply should be wired through the pipe. The lamps must be installed according to the regulations, and the leakage protector should be installed on the side of the power supply.

 

19.The electric welding machine shall be equipped with a separate switch. The shell of electric welding machine should be protected by zero connection or grounding. All electric welding machines used in the construction site must be equipped with electric shock protector. The wiring shall be firmly crimped and installed with reliable protective cover. The welding wire should be double line in place, and metal pipe, metal scaffold, track and structural steel bar should not be used as loop ground wire. There is no damage to the welding wire and the insulation is good. The setting point of electric welding machine should be damp proof, rain proof and smashing proof.

DEAR Air Separation Solve YourPreventive measures for electric shock accidentsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What is the Air separation unit instrument cluster and what is the relationship between transmitters, display tables, regulators, and membrane control valves?Air separation unit.1 g potassium dichromate or 2 g sodium nitrite can be added to each liter of water (not suitable for nonferrous metal degreasing); due to the toxicity or explosion of degreasing agent, attention must be paid to prevent poisoning and formation of explosive mixture. In alkaline cleaning, the pipeline with more oil stains is heated to 60-90 ℃ with 10% sodium hydroxide solution, then neutralized with 15% nitric acid and washed with clean water.Air separation unit.From the vaporization temperature (saturation temperature) of liquid oxygen, if the liquid oxygen surface is too high, the greater the static pressure difference between the upper and lower liquid oxygen surface, the higher the average pressure of liquid oxygen and the corresponding saturation temperature. In order to maintain the heat transfer temperature
2026.11.02
The air in nature is not absolutely dry, and a certain amount of gaseous water vapor is always mixed inside, which is a conventional part of air. Under normal pressure and normal temperature, water vapor is evenly dispersed in the air and will not condense into liquid water, so we cannot directly observe water. In the air separation operation, the air is first compressed by the air compressor. After the air is compressed, the volume is greatly reduced, and the density of water vapor in unit space increases sharply. At the same time, the saturated water content of air will change with the increase of pressure. Under high pressure, the upper limit of water vapor contained in air tends to be fixed. When the water vapor content exceeds the saturation value corresponding to the pressure, the air will reach the supersaturated state, which has the basis of water precipitation. The air compression process will generate a lot of heat, and the high temperature environment can temporarily improve
2026.10.30
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top