How to check the safety of small air separation unit before pressure testing?

How to check the safety of small air separation unit before pressure testing?
Aug 13, 2025
Author: DEAR AST

Approved pressure test specifications and instructions or sketches are available at the test site.

For multi-pressure stage equipment, all manual and automatic valves are checked to be in the correct open/closed position.

All automatic valve operating mechanisms are adequately protected against overpressure.

Pressure tests requiring safety nets, safety shields or other restraints at specified safety distances.

Each pathway is equipped with a 1 . 5 to 3 times the pressure range and calibrated within the last 90 days.

All test pipes and joints are rated within the specified limits.

Each access road is equipped with a safety valve set at 5% of the pressure above the initial test pressure, which has been calibrated and complies with the requirements.

The safety valve is installed directly on the test bench or on the pipeline, and so that the manual valve between the test path and the safety valve is not restricted.

All test joints, test covers and blinds are appropriately rated for the pressure.

All changes in test pressure have been indicated on the test sketch or test instructions and signed off by the design

That the test plan is prepared in such a way of small air separation unit that only one access road is pressure tested at a time and that the sequence of tests begins with the highest pressure value.

The tests are carried out by air, or if not, all enclosed spaces are properly ventilated and the equipment and access to these spaces by employees has the necessary means of detection or there are measures to vent the test gases to the outside.

 

Dear Air Separation has extensive technical experience from production and design, and pressure tests must be approved by safety officers of small air separation unitin accordance with standard inspection procedures before they can be carried out.

0

DEAR Air Separation Solve YourHow to check the safety of small air separation unit before pressure testing?You can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The non-power consuming option for liquid air separation plants can be used for full liquid air separation plants,where the produced liquid is sold off. This approach is currently available for most LNG receiving stations. For air separation units with a large cold capacity, the liquid air can be pressurised to 6baA in a vacuum storage tank, and then heat exchanged through a heat exchanger, instead of the air compressor, directly into the cold box for distillation. At the same time in the cold b...
2026.03.13
1. Before connecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering. 2. When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes. 3. The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.
2026.03.12
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top