What are the requirements for the construction of piping for liquid air separation plant?

What are the requirements for the construction of piping for liquid air separation plant?
Jan 12, 2022
Author: DEAR AST

Before installation of piping for liquid air separation plant, oxygen piping should be subjected to strict acid cleaning and degreasing in accordance with the national standard "Safety Technical Regulations for the Production of Oxygen and Related Gases by Deep Freezing", and then blown clean with dry air or nitrogen without oil.

 

When the oxygen pipeline has not been put into operation for a long time after installation and construction, it should be protected with dry gas to prevent humid air from entering and making the pipeline rusty. Oxygen pipeline construction of small air separation unit should be completed after a tight blowing, pressure testing and gas tightness test. Oxygen blowing is strictly prohibited. Oxygen pipeline welding should be used argon gourd welding, and upgrade processing according to national standards. Pipeline cleaning is very important to prevent fires in the oxidiser system. Contaminants include strange types, organic films, particles and metal debris. Contaminants in the system are most likely to ignite and are the start of the ignition chain. Cleaning agents include: aqueous (cleaners, alkalis and acids), solvents, sanding. Cleaning techniques include: immersion (dipping), liquid rinsing, through balling, rinsing with pressure, rubbing or brushing, vapour degreasing, gas blowing, grit blasting etc. The components pipes are cleaned first and then assembling them. If contaminants can be seen by eyes that means the cleaning is not qualified. The cleaned piping needs to be protected tightly.

 

Dear Air Separation has the appropriate qualifications and experience in the construction of oxygen piping in large air separation plant, and the strict implementation of technical measures to ensure that the installation of high quality requirements.

旋转-DSC03521

DEAR Air Separation Solve YourWhat are the requirements for the construction of piping for liquid air separation plant?You can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
The skid mounting of equipment refers to connecting the pipelines, equipment, pumps, control cabinets, electrical instruments and other components of the complete set into a whole according to the designed process flow, and fixing them on an integral base through welding, bolting and other connection methods. Without site installation, it can be directly completed the mechanical and electrical integration installation of the whole set in the plant area, then transporting and hoisting will be convenient.
2024.05.15
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top