Removal of perlite in cold box

Removal of perlite in cold box
Apr 18, 2025
Author: DEAR AST
Question Reply

1.The removal of perlitesite shall be supervised by full-time personnel and guided by professionals. The principle of who organizes,who takes responsibility shall be followed. There should be a safe passage and a warning line at the removal of perlite site, and it is strictly forbidden to enter.

 

2.Dry air shall be used to warm the sand during the removal and knock the cold box to remove the pearlite caking, so as to prevent equipment damage caused by falling caking.

 

3.The removal of perliteshould be carried out in layers and sand holes should be opened at different heights of the cold box. (It can be adjusted according to the site conditions)

 

4.In the process of removal of perlite, always supervise the caking on the top and enter the cold box for cleaning at any time.

 

5.In case of severe weather such as rain, snow, strong wind or sand storm danger, the construction party and the owner shall jointly confirm that the sand stripping work shall be postponed.

 

6.Removal of perliteshall be carried out in accordance with the technical specification for removal of perlitein cold box. If any step conflicts with the specification requirements, the work shall be stopped.

DEAR Air Separation Solve YourRemoval of perlite in cold boxYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for the design of piping in the cold box of liquid air separation plant? The design of piping in the cold box ofiquid air separation plant is complex and troublesome, and each pipeline has its own process requirements. As one of the most complex components in the cold box of air separation equipment, low temperature piping is the key to ensure the stable and safe operation of small air separation unit. A set of air separation equipment in the cold / hot end of the plat...
2025.05.15
1. Before hoisting, check and confirm whether the crane body, crane legs, lifting rigging and wire rope meet the safety requirements and hoisting conditions. 2. The hanging points of hoisting facilities shall be confirmed to prevent deviation and inclination; steel wire rope or sling shall be used for protection of edges and corners; sling and U-ring shall be used for lifting objects. 3. The commander shall use inter-phone for command, and special personnel shall be assigned for command, and the personnel shall stand at the position where the lifting object can be fully observed; warning isolation shall be set up in the hoisting area, and no one shall stand under the lifting object. 4. For large-scale hoisting, the hoisting safety scheme shall be formulated in combination with the company's special operation system.
2025.05.14
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top