Removal of perlite in cold box

Removal of perlite in cold box
Oct 09, 2020
Author: DEAR AST
Question Reply

1.The removal of perlitesite shall be supervised by full-time personnel and guided by professionals. The principle of who organizes,who takes responsibility shall be followed. There should be a safe passage and a warning line at the removal of perlite site, and it is strictly forbidden to enter.

 

2.Dry air shall be used to warm the sand during the removal and knock the cold box to remove the pearlite caking, so as to prevent equipment damage caused by falling caking.

 

3.The removal of perliteshould be carried out in layers and sand holes should be opened at different heights of the cold box. (It can be adjusted according to the site conditions)

 

4.In the process of removal of perlite, always supervise the caking on the top and enter the cold box for cleaning at any time.

 

5.In case of severe weather such as rain, snow, strong wind or sand storm danger, the construction party and the owner shall jointly confirm that the sand stripping work shall be postponed.

 

6.Removal of perliteshall be carried out in accordance with the technical specification for removal of perlitein cold box. If any step conflicts with the specification requirements, the work shall be stopped.

DEAR Air Separation Solve YourRemoval of perlite in cold boxYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The most likely leakage of switching heat exchanger is the welding line, especially the joint of the head and the pipeline. Most of the causes of leakage are the quality problems of manufacture and installation, which are also related to maintenance. The working condition of switching heat exchanger is poor. It is not only impacted by alternating airflow, but also changes greatly in airflow temperature. In long-term operation, the weak parts are easy to leak. Therefore, the welding quality should be strictly guaranteed during manufacture and installation. After installation, strict leak detection and pressure test must be carried out before driving, and problems should be dealt with timely to avoid passivity after driving. There are three methods to check whether the switching heat exchanger leaks in operation: 1) flow method. When a large amount of leakage occurs between the channel of product oxygen or product nitrogen and air channel, the output of oxygen or nitrogen increases ob...
2024.03.29
Oxygen product: liquid oxygen is pumped out from the lower tower plate of the low pressure tower and sent to the storage tank, the inner compressed oxygen pump is placed next to the liquid oxygen storage tank, the liquid oxygen extracted from the storage tank is pressurized by the oxygen pump and sent out after gasification and reheating in the main heat exchanger to get the required oxygen product in liquid air separation plant. The nitrogen product is pumped from the top of the pressure tower...
2024.03.28
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top