How to check if the cooling water circulation of the air separation equipment is fully connected?

How to check if the cooling water circulation of the air separation equipment is fully connected?
Apr 17, 2025
Author: DEAR AST

Checking whether the cooling water circulation of the air separation equipment is fully connected is an important step to ensure the normal operation of the equipment.
Observe the operation status of the cooling water system, check that the water level in the water tank is normal, and there are no leaks or abnormal drops. Observe the flow of water and observe the flow of cooling water through transparent pipes or observation windows. Check the connection of the pipeline, inspect all interfaces of the cooling water pipeline one by one, and ensure that there are no leaks or looseness at the interfaces; Check that the installation bracket of the pipeline support is stable and not loose. Check the valve status and ensure that all valves in the cooling water system (such as globe valves, regulating valves, check valves, etc.) are in the correct working condition. Detect the flow rate and pressure of cooling water, install flow meters and pressure gauges, and compare the design parameters. Check the water quality of the cooling water and regularly test the water quality: Take samples regularly to test the water quality of the cooling water, including indicators such as pH value, turbidity, hardness, chloride ion content, etc. Clean and replace the cooling water, promptly clean the cooling system and replace it with new cooling water based on the water quality test results. Replacing with new cooling water can prevent water quality deterioration from causing damage to the system.
Comprehensive inspection and debugging, comprehensive inspection, on the basis of completing the above inspections, conduct a comprehensive inspection of the cooling water system. Ensure that the cooling water system can operate normally.

DEAR Air Separation Solve YourHow to check if the cooling water circulation of the air separation equipment is fully connected?You can also learn about otherBiogas purification FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Liquid air separation plant solutions Most liquid air separation plant cold energy receiving stations have a peaking role, their use is generally for domestic gas or car refuelling, with high and intermittent periods of gas consumption, for example 1-2 hour peaks in the morning and midnight. If the liquid air separation plant vapourisation plant is intermittent, the plant will not operate continuously. The solution is based on the intermittent use of liquid air separation plant and is character...
2026.07.08
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top