What requirements should be met when assembling gauge tubes and cold boxes for small air separation unit?

What requirements should be met when assembling gauge tubes and cold boxes for small air separation unit?
Apr 16, 2025
Author: DEAR AST

Small air separation unit assembly gauge tube should meet the following requirements: gauge tube should be degreased, and it is appropriate not to test pressure after assembly; gas gauge tube (such as pressure gauge tube) should not be in contact with cold equipment or cold tube, the distance should not be less than 2000 mm; liquid level gauge tube of the upper valve tube should be made from the container for 1/10. slope upward sloping to the valve, the lower valve tube from the container in the horizontal lead, in close to the wall of the cold box about 300 The lower valve pipe is led from the container horizontally and is bent into an omega shape to the valve within about 300 mm of the wall of the cooler (hot zone part).

 

The small air separation unit should meet the following requirements: the welding seam on the outer surface should be continuously welded and should not leak; the non-lead dip should not exceed 2/1000; the flange of the vertical liquefied gas pump should not exceed 1/1000 in its plane.

 

Dear Air Separation continues to develop new technologies for small air separation unit and large air separation unit, and applies strict requirements in all aspects of assembly units to ensure high quality units.

5200Nm3h型成套设备

DEAR Air Separation Solve YourWhat requirements should be met when assembling gauge tubes and cold boxes for small air separation unit?You can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top