Home / All Air Separation tags /

Big Data Application of Deep Cold Air Separation Equipment

Big Data Application of Deep Cold Air Separation Equipment
News of Big Data Application of Deep Cold Air Separation Equipment
More
May 06, 2026
DEAR Air Separation's ash conveying energy-saving technology empowering Indonesia Morowali Industrial Park receives high recognition
Feb 24, 2026
The first successful order after the Spring Festival in the Year of the Horse! DEAR Air Separation's EMC model is implemented at Jinma Energy, creatin
Faq of Big Data Application of Deep Cold Air Separation Equipment
More
The air separation cold box is filled with insulation material, generally pearlite, and the pearlite particles are filled with air. After the operation of the air separation unit, the temperature of the insulation material and the air will decrease, and the volume will decrease. At this time, if the cold box is well sealed, negative pressure will be formed in the cold box, and the cold box may be compressed under the effect of internal and external pressure difference. If the cold box is not well sealed, the moisture outside the cold box will enter the cold box, making the insulation material damp, and the cold loss of the unit will be greatly increased. In order to prevent the cold box from being compressed and the thermal insulation material from becoming damp, dry nitrogen or crude nitrogen is usually filled into the cold box after the unit is running to keep the cold box at slightly positive pressure.
Oct 13, 2026
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
Sep 29, 2026
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top