当前位置: Home / FAQ /

Small air separation FAQ

1 pay attention to the direction of the arrow on the valve and the process requirements of the media flow direction, in order to avoid installation errors. 2 The pipeline connected with the valve should be thoroughly cleared of dirt, dust and other foreign mechanical impurities before installation. Prevent damage of the sealing surface of the valve. 3 The cold valve on the cold box should be installed at the same time as the corresponding brack...
Jan 21, 2022
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top