Small air separation units water circulation system problem prevention

Small air separation units water circulation system problem prevention
Mar 28, 2022
Author: DEAR AST

Sediment deposition

  1. Determine whether the system has sediment deposition: circulating water turbidity for a long time (3 months) high (greater than 20NTU), heat exchanger tend to temperature rise significantly (longer than 1 ℃ / month)
  2. Treatment method: chemical cleaning, with hydrochloric acid with hydrofluoric acid (sediment temperature increases will have thermal scale precipitation).

Biological slime

  1. Determine whether there is biological slime deposition: cool water tower has a large number of bacteria and algae, heat exchanger tend to rise significantly in temperature (longer than 1 ℃ / month)
  2. Processing program: add biocide, dispersant, defoamer. A comprehensive cleaning and stripping of the system.

Bacterial algae multiplication

  1. Judgment method: cool water tower wall, there are obvious bacteria and algae reproduction: 
  2. Treatment solution: add biocide, dispersant, defoamer, and carry out a comprehensive cleaning and stripping of the system.

Dear air separation using the world's most advanced design software design, by the intelligent factory intelligent manufacturing, supplemented by the integration of the two supporting management, coupled with the professional installation team with extensive experience in air separation equipment, as well as to perfect pre-sales, sales, after-sales service system, will provide all users with complete sets of high-quality small air separation units, large air separation units and liquid air separation plants.

贵州省诺亚-3600

DEAR Air Separation Solve YourSmall air separation units water circulation system problem preventionYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Upper tower and main condenser assembly in small air separation unit Assembly using wind, electric tools to cut away the test pressure blind, or head with aircraft methods to clean up the welding area; according to the chart processing bevel, the site preparation scaffolding must be safe and solid, welders should be in accordance with the provisions of T4734-22 qualified by examination, group positioning welding and formal welding are used for two people at the same time double-sided cross-weld...
2026.07.13
Air cooling column start-up process
2026.07.10
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top