How to adjust the cooling capacity of air separation unit?

How to adjust the cooling capacity of air separation unit?
Mar 09, 2026
Author: DEAR AST

The adjustment of cold production of air separation unit shall be realized through multi-link cooperative operation, and the core is to balance the supply and demand relationship of cold production of the system.
Dynamic adjustment of expander: rotate the nozzle blade to change the gas flow sectional area. When the opening increases, the expansion air volume increases and the refrigerating capacity increases accordingly; On the contrary. The inlet pressure is controlled by adjusting the opening of the throttle valve in front of the expander. The decrease of the pressure will reduce the gas expansion ratio, thus reducing the refrigerating capacity.
Linkage control of rectification working condition: when the main cooling liquid level is too high, reduce the expansion air volume to avoid deterioration of rectification working condition; On the contrary, the expansion shall be increased in case of insufficient cooling capacity. The reflux liquid amount of the lower column is controlled by the liquid nitrogen throttle valve, which indirectly affects the rectification potential of the upper column, and then regulates the cooling demand.
System pressure and temperature management: appropriately turn down the oxygen and nitrogen supply valves to increase the low and medium pressure and reduce the refrigerating capacity; Conversely, decreasing the pressure increases the cold generation. Regulate the cooling water flow of air compressor to change the inlet temperature of high pressure air. In addition, open the blow off valve at the bottom of the heat exchanger to discharge the subcooled liquefied air and assist in regulating the cooling capacity.
Cooling capacity consumption and balance: when the cooling capacity is excessive, part of the cooling capacity consumed by liquid oxygen can be discharged, but it shall be ensured that the liquid oxygen surface is not lower than the safe value. Regularly check the heat transfer efficiency of the heat exchanger to avoid the loss of cooling capacity caused by the expansion of temperature difference at the hot end; At the same time, the multistage expansion system can be used for cooling in stages to reduce heat loss.
The cooling capacity shall be adjusted slowly and carefully to avoid the violent fluctuation of parameters affecting the rectification working condition. Key parameters such as main cooling liquid level and oxygen purity shall be monitored synchronously during operation to ensure stable operation of the system.

DEAR Air Separation Solve YourHow to adjust the cooling capacity of air separation unit?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top