Installation of the air pre-cooling system in small air separation unit

Installation of the air pre-cooling system in small air separation unit
Mar 16, 2022
Author: DEAR AST

Installation of the air pre-cooling system in small air separation unit

(1) Air cooling tower is a pressure vessel, the site is strictly prohibited on the tower body fire.

(2) installation requirements: verticality <1/1000, the full length of the range shall not exceed 10mm.

(3) loading material before, clear the tower debris and check the tower pieces of fasteners, confirm no loose, off.

(4) bare cold before, air-cooled tower, water-cooled tower at the top of the screen mist trap again check, confirm no gap, no loose.

(5) filler into the tower before, need to check the filler specifications, apparent quality, strength, quantity, etc. to confirm the correct. If the filler can not be filled immediately, need to be stored in the warehouse, should not be long-term open-air placement.

(6) filler installation: filler shall not be mixed, shall not contact grease. Can not be directly from the top of the tower directly into, should be from different heights of the hole for layering filling.

(7) test pressure: after installation, to work pressure on the system for gas tightness test, maintain pressure time shall not be less than 2 hours, shall not leak.

Dear Air Separation manufactures full set of small air separation units and large air separation units including air pre-cooling systems.

山东传洋集团20000

 

DEAR Air Separation Solve YourInstallation of the air pre-cooling system in small air separation unitYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
The skid mounting of equipment refers to connecting the pipelines, equipment, pumps, control cabinets, electrical instruments and other components of the complete set into a whole according to the designed process flow, and fixing them on an integral base through welding, bolting and other connection methods. Without site installation, it can be directly completed the mechanical and electrical integration installation of the whole set in the plant area, then transporting and hoisting will be convenient.
2024.05.15
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top