Design basis for circulating water in small air separation units

Design basis for circulating water in small air separation units
Mar 31, 2022
Author: DEAR AST

According to the system water balance, water treatment to ensure that the circulating water system does not corrode and scale.

Water treatment operation steps: flushing the system with clean water is to remove mechanical impurities and suspended matter from the system. When the water system is full of water, then turn on the pump to run. When the turbidity of the circulating cooling water system is high, drainage replacement is carried out. When the turbidity is below 20mg, then move on to the next step.

Cleaning the pre-film in small air separation units: when putting medicine in the cooling tower it is forbidden to remove the water from the cooling tower. Drain again after 24 hours of continuous operation and refill with fresh water. The purpose of this step is to remove oil from the system and to purify the metal surfaces of the water cooling tower of the air separation plant. The next cleaning stage prohibits the drainage of water, which is then drained after 72 hours of continuous operation and replenished with clean water. The purpose of this step is to form a protective film on the metal surface to prevent corrosion of the metal.

The unattended system developed by Dear Air Separation allows operation and maintenance personnel to monitor and record data on site small air separation units from thousands of miles away and to optimise in real time for more accurate and rapid regulation of small air separation units and large air separation units as well as liquid air separation plants.

18

DEAR Air Separation Solve YourDesign basis for circulating water in small air separation unitsYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Before filling with pearlite, the water accumulated on the foundation surface of air separation unit must be removed, dried with hot air, and all manholes shall be closed. 2. When filling pearlite, all containers and pipes in the cold box should be inflated and kept at 50kPa pressure, then slightly open the valve of each meter pipeline, and all thermometers should be electrified to check whether the thermometer cable is damaged during the filling process. 3. The filled pearlite shall not be mixed with combustibles. 4. When filling with pearlite, coarse mesh or pearlite pouring device should be set at the manhole on the top of the cold box to prevent whole bag pearlite from entering the cold box. 5. After the pearlite is filled, the manhole shall be sealed.
2026.08.18
What is the oxygen extraction rate?
2026.08.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top