The small air separation unit maintenance workers decided to temporarily shut down, export the gas in the tower, two argon pump cold box after picking sand, check the argon pump cold box in the liquid argon and to coarse argon tower valve, the valve after the indentation at the crack opening, low pressure system cold gas leakage. The inspector Personnel wrapped with non-woven cotton, the main tower to maintain a slight positive pressure, for local heating of the liquid argon pump after the main ...
May 23, 2022