How to perform bare cooling on air separation equipment and what work needs to be done after bare cooling

How to perform bare cooling on air separation equipment and what work needs to be done after bare cooling
Jun 28, 2023
Author: DEAR AST

In bare cooling, the main equipment such as the distillation tower and main condenser evaporator should be sequentially cooled to the lowest temperature for 2 hours each. Then cool the entire air separation equipment until it reaches equilibrium temperature, so that all equipment pipelines have white frost on their surfaces, and maintain it for 3-4 hours.

In the cold state, each part should be carefully inspected for deformation and leakage. The location of the leakage point can be determined based on the frost formation and should be marked. After freezing, the flange screws should be tightened again to compensate for the screw relaxation caused by different thermal expansion coefficients at low temperatures. But it should also be noted not to tighten too tightly to prevent excessive prestressing. Then sweep the frost and avoid melting it in the insulation box, which may affect the filling of the insulation material. Heat it again to room temperature and conduct an air tightness test.

If there are any treatment items, they need to be exposed again after treatment. The number of times and qualification standards for bare cooling depend on the specific situation. After the bare cooling is qualified, each adsorber is loaded with adsorbent, and the cold insulation box is filled with cold insulation materials.

DEAR Air Separation is a professional research and development, manufacturing, and installation of various complete sets of air separation equipment. With unique design and insights into air separation industry solutions, we provide customers with safe and reliable products.

DEAR Air Separation Solve YourHow to perform bare cooling on air separation equipment and what work needs to be done after bare coolingYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
 The purpose of the blowing is to clean out the residual slag, aluminium chips and other debris from the piping and vessels. the air source for blowing is provided by the turbine compressor, and the air cooling tower must be activated. 3. blowing principle, first outside the tower, after the tower, blowing brush to be one after another, in the blowing with the air pressure: low pressure system. Should be maintained at 40 a 50kpa high pressure system: should be maintained at 250 ~ 400k...
2025.07.23
Due to improper adjustment of seal gas pressure during operation, liquid oxygen pump can not pump liquid or leak.   From the quality point of view, when the sealing pressure is too high, there will be gas leakage into the pump through the labyrinth seal, resulting in the impeller with gas or even idling, resulting in liquid injection or pressure drop; when the air pressure before sealing is too low, there will be liquid oxygen leakage.   From the quantity point of view, when (p1-p3...
2025.07.22
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top