How to perform bare cooling on air separation equipment and what work needs to be done after bare cooling

How to perform bare cooling on air separation equipment and what work needs to be done after bare cooling
Jun 28, 2023
Author: DEAR AST

In bare cooling, the main equipment such as the distillation tower and main condenser evaporator should be sequentially cooled to the lowest temperature for 2 hours each. Then cool the entire air separation equipment until it reaches equilibrium temperature, so that all equipment pipelines have white frost on their surfaces, and maintain it for 3-4 hours.

In the cold state, each part should be carefully inspected for deformation and leakage. The location of the leakage point can be determined based on the frost formation and should be marked. After freezing, the flange screws should be tightened again to compensate for the screw relaxation caused by different thermal expansion coefficients at low temperatures. But it should also be noted not to tighten too tightly to prevent excessive prestressing. Then sweep the frost and avoid melting it in the insulation box, which may affect the filling of the insulation material. Heat it again to room temperature and conduct an air tightness test.

If there are any treatment items, they need to be exposed again after treatment. The number of times and qualification standards for bare cooling depend on the specific situation. After the bare cooling is qualified, each adsorber is loaded with adsorbent, and the cold insulation box is filled with cold insulation materials.

DEAR Air Separation is a professional research and development, manufacturing, and installation of various complete sets of air separation equipment. With unique design and insights into air separation industry solutions, we provide customers with safe and reliable products.

DEAR Air Separation Solve YourHow to perform bare cooling on air separation equipment and what work needs to be done after bare coolingYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top