During the cold operation process after the fault shutdown of the air separation unit, after the air compressor system, air precooling system and molecular sieve purification system are put into normal operation, start the supercharger, at the same time lower the column to boost the pressure, and lower the column to boost the pressure at the same time. The boosting process should be slow to prevent the upper column overpressure. When controlling the upper column pressure, the temperature of the carbon steel pipeline should be ensured to be ≥ - 30 ℃, and the main column backflow nitrogen can be used to flow out of the discharge valve of the subcooler The discharge valve of the main column backflow sewage nitrogen out of the subcooler shall be coordinated and adjusted.

 

After the system pressurization, start the expander system. If the liquid level of the lower main cooler is still at full scale, in order to speed up the operation of the lower main cooler as soon as possible, part of the main cooler liquid oxygen can be properly discharged to a higher level than that in normal operation. In the process of purification, it is necessary to increase the opening of the valve of liquid nitrogen returning to the lower column and the valve of liquid nitrogen throttling into the upper column, so as to speed up the main cooling work. The increase of the main cooling heat load is conducive to the rapid improvement of oxygen purity.

 

The liquid oxygen of air separation unit is pumped out from the liquid oxygen storage tank and sent to the main heat exchanger for heat exchange. Liquid oxygen should be sent to the main heat exchanger in proportion according to the amount of processing air. The speed should be controlled and the change of oxygen purity should be paid close attention to, so as to prevent the cooling capacity from entering the unit too fast and affect the recovery time of oxygen purity. The common process organization form of liquid oxygen pump is adopted. As long as there is a certain amount of liquid oxygen in the storage tank, liquid oxygen can be introduced into the cold box after the end of aeration, so as to accelerate the rectification, shorten the qualified time of oxygen and nitrogen purity, and the effect of energy saving is very obvious.

DEAR Air Separation Solve YourHow to operate cold start-up aFfter fault shutdown of air separation unitYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top