当前位置: Home / Faq / Air separation parts FAQ /

Air separation equipment in the process of operation overload, the main cooling liquid level long not high should be how to solve?

Air separation equipment in the process of operation overload, the main cooling liquid level long not high should be how to solve?
Jul 11, 2024
Author: DEAR AST

Overloading of air separation equipment during operation means that the load of the equipment exceeds its rated load, resulting in unstable behaviour of the equipment, such as noise, vibration and excessive heat. Overload may be caused by bottlenecks in the production process, overloading of production capacity or operational errors. Solutions: Check the air pressure, flow rate and temperature parameters of the equipment and make sure they are within the normal range; ensure that the operating conditions and ambient temperature of the equipment are suitable; limit the load of the equipment to avoid overloading.
The reasons why the main cooling liquid level is not high may include incomplete loss of heat exchange in the main heat exchanger, low efficiency of the expander with small temperature difference, high temperature of air into the main heat exchanger, and leakage of the equipment. Solution: Reasonable distribution of cold, if the heat exchanger is blocked, it should be comprehensively heated and blown out; check the expander and deal with it; check the air-cooling system and molecular sieve adsorber and deal with it; check the cold-retaining materials, check the leakage and deal with it; and reduce the amount of liquid taken out.
There are various technical problems of air separation equipment, DEAR Air Separation has long-term experience in establishing a sound equipment management system and operating procedures, standardising the operation and maintenance process of the equipment, reducing the technical problems of the air separation equipment, and guaranteeing the operating efficiency and reliability of the equipment.

DEAR Air Separation Solve YourAir separation equipment in the process of operation overload, the main cooling liquid level long not high should be how to solve?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Why is the cryogenic air separation air compression system the most power consuming link?
2026.03.23
Screw compressor is a positive displacement compressor from the mechanical type, which is composed of the driving rotor and driven rotor, the main body and a pair of synchronous gears. Therefore, the common faults of screw compressor are as follows: 1. The bearing is burnt out. Because of the foreign matter in the oil system, the oil pressure and the quality of the oil are reduced, resulting in the bearing burning out. The main treatment methods are: check the oil supply system; clean the oil filter and the cooling pipe of the oil cooler; check and adjust the oil pressure regulating valve; test the oil quality, and replace the oil when it is not good; check and deal with the oil leakage points. 2. The rotor is burnt out. When foreign matters enter into the compressed medium system, the temperature of the rotor rises, the temperature of the cooling oil of the rotor increases due to the high temperature of the inhaled medium, and the compression ratio increases, which may cause the
2026.03.20
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top