当前位置: Home / Faq / Air separation parts FAQ /

Common thermometer of air separation plant

Common thermometer of air separation plant
Dec 24, 2025
Author: DEAR AST
Question Reply

There are four kinds of commonly used thermometers in air separation plant: industrial internal standard glass thermometer, thermocouple thermometer, thermal resistance thermometer and pressure gauge thermometer. According to the principle of temperature measurement, the range of temperature measurement and whether it can be transmitted remotely, four kinds of thermometers are used in different temperature measuring occasions of air separation plant. Industrial internal standard glass thermometer is used in small air separation plant to measure the temperature of all levels of compressor gas and cooling water locally, and it is also used for temperature measurement during heating and thawing; thermocouple thermometer is used for purifier; thermal resistance thermometer is used for low temperature measurement inside cold insulation box; pressure gauge thermometer is used for measuring lubricating oil temperature.

DEAR Air Separation Solve YourCommon thermometer of air separation plantYou can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top