What requirements should the test run of refrigeration system meet

What requirements should the test run of refrigeration system meet
Oct 10, 2023
Author: DEAR AST
Question Reply

I. Starting and running should be conducted according to the following requirements:
1. Water should be supplied to the cooling water system and the cooling water system. When the cooling water is below 20 °C, it should be adjustedValveReduce the water supply of cooling water;
2. Start the generator pump and the absorbent pump to make the solution circulate;
3. The steam or hot water valve should be opened slowly to supply water to the generator. For the set with steam as heat source, the set should be operated under lower steam pressure first, after there is no abnormal phenomenon, gradually increase the steam pressureEquipmentThe specified value of technical documents;
4. When the water bag of the evaporator's refrigerant has enough water, the evaporator pump should be started and the refrigerator should be adjusted to make it run normally;
5. During the start-up operation, the vacuum pump should be started to remove the residual air in the system or the non-condensable gas generated from the initial operation.

II. The items and requirements checked during Operation should meet the following provisions:
1. The concentration and temperature of dilute solution, concentrated solution and mixed solution should accord with the provisions of equipment technical documents;
2. The water volume and temperature difference between inlet and outlet of cooling water and chilled water should accord with the provisions of equipment technical documents;
3. The pressure and temperature of heating steam and the temperature and flow of condensate water or the temperature and flow of hot water should conform to the provisions of equipment technical documents;
4. The proportion of cold agent water mixed with lithium broach should not exceed 1.04;
5. The system should keep the specified vacuum degree;
6. The operation of shielded pump should be stable, and there should be no blocking, overheating, abnormal sound and other phenomena;
7. The movements of each safety protection relay should be sensitive and correct,MeterThe indication should be accurate.

DEAR Air Separation Solve YourWhat requirements should the test run of refrigeration system meetYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The air separation column mainly includes main heat exchanger, liquefier, distillation column, condensing evaporator, etc. The main heat exchanger, condensing evaporator and liquefier are plate type of heat exchangers. It is a new type of all aluminum metal composite partition heat exchanger. The average temperature difference is small, and the heat exchange efficiency is as high as 98-99%. Distillation column is the unit of air separation. The types of column unit are classified according to the internal parts. The sieve plate column with sieve plate, the bubble cap column with bubble cap plate, and the packed column with packing material. The sieve plate is widely used in air separation distillation column because of its simple structure, easy manufacture and high efficiency. Packed column is mainly used for distillation column with diameter less than 0.8m and height less than 7m. Bubble column is seldom used because of its complicated structure and difficult manufacture. Turbine
2026.04.24
What precautions shall be taken for the regulation of excess oxygen in the air separation unit?
2026.04.23
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top