The air separation unit assembly meter tube shall meet the following requirements:

 

1、 The gauge pipe shall be degreased and shall not be assembled after pressure test;

 

2、 The gas meter pipe (such as pressure gauge pipe) shall not contact with the cold equipment or cold pipe, and the spacing shall not be less than 2000mm;

 

3、 The upper valve pipe of the liquid level gauge pipe should be 1 / 10 from the container. The slope is inclined upward and leads to the valve obliquely. The lower valve pipe is led out horizontally from the container and bent into an Ω shape within about 300mm near the cold insulation box wall (hot zone part) to the valve.

 

The cold insulation box of air separation unit assembly shall meet the following requirements

 

1、 The welds on the outer surface shall be continuously welded without missing welding;

 

2、 The verticality shall not exceed 2 / 1000;

 

3、 The non levelness of the flange of the vertical liquefied gas pump shall not exceed 1 / 1000.

 

Regulations on strength test and air tightness test before air separation equipment is in place:

 

1、 The pressure equipment with strength test and qualification certificate made by the manufacturer may not be subject to strength test, but only air tightness test. However, if the equipment is found to have damage traces or has been partially modified on site or has been parked for too long, the strength test shall be conducted;

 

2、 Water pressure method shall be applied for strength test, and air pressure method shall be applied for equipment (distillation tower, plate fin heat exchanger, adsorption filter, etc.) that are not suitable for water as medium or with complex structure, but reliable safety measures must be taken and studied and decided by relevant departments;

 

3、 The pressure and pressure stop time of strength test and air tightness test shall comply with the provisions of design or equipment technical documents.

 

DEAR air separation promoted new development of air separation equipment technology with high quality and maintained a sustained and stable development trend.

DEAR Air Separation Solve YourWhat requirements and regulations should be met for the assembly of meter tube, cold insulation box and strength and air tightness test before positioning of air separation equipmentYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top