Prevention measures for fire and explosion accidents

Prevention measures for fire and explosion accidents
Jan 07, 2025
Author: DEAR AST
Question Reply

1.According to the specific situation of the construction, formulate the fire protection scheme, establish and improve the fire safety system, and strictly abide by the operation rules.

 

2.Flammable and explosive materials such as paint and thinner shall not be stored in the project site.

 

3.The construction unit is not allowed to set up seasoning room in the project, and is not allowed to carry out paint allocation in the project.

 

4.No smoking is allowed in the construction site. A fire permit shall be issued and a special person shall be assigned to supervise the operation.

 

5.The operation site should be equipped with sufficient fire-fighting equipment.

 

6.During the construction period, the use of various open fire operations in the project shall be approved by the safety and environmental protection department of the construction unit, and sufficient fire-fighting materials and fire-fighting equipment shall be provided.

 

7.It is strictly forbidden to store oxygen cylinders and acetylene cylinders in the construction site.

 

8.During construction, the distance between oxygen cylinder and acetylene cylinder should be 10 meters away from the hot work point, and the distance between oxygen cylinder and acetylene cylinder should be more than 5 meters.

 

9.For electric and gas welding operations, fire permit shall be obtained, and special personnel shall be assigned to take care of them. Sufficient fire fighting equipment shall be provided at the construction site.

 

10.The operators must hold the work license, apply for the fire permit at the relevant personnel of the project management department, clean up the inflammable and explosive materials in the operation area according to the requirements, and take measures to block the holes that may splash sparks.

DEAR Air Separation Solve YourPrevention measures for fire and explosion accidentsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top