1.According to the specific situation of the construction, formulate the fire protection scheme, establish and improve the fire safety system, and strictly abide by the operation rules.

 

2.Flammable and explosive materials such as paint and thinner shall not be stored in the project site.

 

3.The construction unit is not allowed to set up seasoning room in the project, and is not allowed to carry out paint allocation in the project.

 

4.No smoking is allowed in the construction site. A fire permit shall be issued and a special person shall be assigned to supervise the operation.

 

5.The operation site should be equipped with sufficient fire-fighting equipment.

 

6.During the construction period, the use of various open fire operations in the project shall be approved by the safety and environmental protection department of the construction unit, and sufficient fire-fighting materials and fire-fighting equipment shall be provided.

 

7.It is strictly forbidden to store oxygen cylinders and acetylene cylinders in the construction site.

 

8.During construction, the distance between oxygen cylinder and acetylene cylinder should be 10 meters away from the hot work point, and the distance between oxygen cylinder and acetylene cylinder should be more than 5 meters.

 

9.For electric and gas welding operations, fire permit shall be obtained, and special personnel shall be assigned to take care of them. Sufficient fire fighting equipment shall be provided at the construction site.

 

10.The operators must hold the work license, apply for the fire permit at the relevant personnel of the project management department, clean up the inflammable and explosive materials in the operation area according to the requirements, and take measures to block the holes that may splash sparks.

DEAR Air Separation Solve YourPrevention measures for fire and explosion accidentsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top