In the internal compression process air separation plant, we generally select the the multistage centrifugal pump as the liquid nitrogen pump. In order to ensure the stable operation of the liquid nitrogen pump, the pump seal mostly adopts the structure of gas-filled labyrinth seal.

 

The seal gas needs enough flow to warm the cryogenic liquid leaking from labyrinth seal. When the seal gas flow decreases to a critical point, the exhaust temperature of the seal gas will drop greatly and cause the interlock shutdown of the pump. With the pump running in the unstable state for a long time, the labyrinth seal will be worn and the gap will be increased, resulting in the increase of seal gas consumption, seal mixture outlet with liquid phenomenon, and causes the exhaust temperature of seal gas to decrease. In addition, the blockage of inlet pipeline filter by mechanical impurities and impurities in the filter screen of self regulating valve will also cause the seal gas flow to be too low.

 

The use principle of seal gas is not only to prevent liquid leakage along the outside of the pump, but also not to allow too much seal gas into the pump, resulting in the liquid nitrogen pump with gas phenomenon. It is suggested that the seal gas pressure can be adjusted by adding self regulating valve. When adjusting the seal gas pressure, it is necessary to ensure that the seal gas inlet pressure is higher than the labyrinth inlet pressure, which is 0.1-0.4Mpa, and the labyrinth inlet pressure is greater than the mixed gas pressure at the labyrinth outlet, which is  0.1-0.2Mpa. In order to prevent the equipment from being damaged by low temperature, it is necessary to ensure that there is no leakage of cryogenic liquid at the labyrinth seal. It is suggested to set a temperature sensor on the side near the pump body in the coupling guard to measure whether there is leakage at the sealing point, so as to give an alarm in time.

DEAR Air Separation Solve YourAdjustment of seal gas pressure and flow in liquid nitrogen pumpYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top