当前位置: Home / Faq / Large air separation FAQ /

Grounding of DCS control system of air separation plant

Grounding of DCS control system of air separation plant
Nov 25, 2024
Author: DEAR AST
Question Reply

In the operation of air separation plant, in order to ensure the accuracy of DCS control system monitoring and the safety and stability of operation, it is necessary to do well of DCS system grounding.

 

Grounding is to connect the circuit and unit with an equipotential or equipotential surface as the common reference point of signal to realize low impedance value, so as to ensure that when the signal, power supply or DCS system equipment entering DCS system is abnormal, it can bear overload current and quickly lead the overload current to the earth, provide shielding layer for DCS system, eliminate electronic noise interference, and provide the whole control system with a shielding layer The system provides reference zero potential of common signal.

 

The grounding of DCS control system shall follow the following principles:

 

1.The logic grounding, signal grounding and shielding grounding in DCS system shall meet the requirements of "one point grounding". Insulated copper stranded wire or cable shall be used to connect to the general grounding copper bar.

 

2.The DCS system shall be insulated from the foundation by installing insulation pads and insulation bolts, and the insulation resistance to ground shall be greater than 50m Ω.

 

3.When the insulation between power supply cabinet, operation console, relay cabinet and foundation is uncertain, they shall not be connected to the general grounding copper bar, but shall be connected to the nearby indoor electrical protection grounding trunk line.

 

4.When selecting the access point of DCS system for public grounding grid, the grounding resistance of common grounding grid shall not be greater than 4 Ω, and the connection resistance shall not be greater than 1 Ω, and the access point of DCS shall be far away from the current entry point.

 

5.The shielding layer of DCS system signal shielding cable shall not float in the air and must be grounded.

DEAR Air Separation Solve YourGrounding of DCS control system of air separation plantYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Answer: 10000nm ³/h is a medium-sized air separation unit. The positioning of each company varies greatly, and there is no absolute best. Deer air separation (deep) is preferred according to the demands of the project 1. Positioning: 1000~50000 air separation home, focusing on energy conservation+digital intelligence integration, which is very suitable for gas Island, metallurgy and new material gas supply in the park 2. Deere air separation advantage: ① The track is focused. There are sufficient 10000 level production cases, and mature achievements in external compression, all liquid and argon processes; ② Complete hardware energy-saving scheme: 8h long-term high-efficiency molecular sieve, waste heat recycling of air compressor, high-efficiency structured packing+high-precision distributor, high extraction rate distillation, stable comprehensive power consumption of 0.44~0.48 kwh/nm ³ o ɑ under the same working condition, saving energy by 10%~15% compared with traditional air separat
2026.11.05
1. Dier air separation (Kaifeng) is recommended. Its profile: a national specialized and new small giant, focusing on 10000-40000 nm ³/h metallurgical and chemical small and medium-sized air separation units, replacement of old and old units, intelligent transformation of stock, and its own intelligent system: self-developed lan'an digital intelligence AIPC system (large vertical AI model of air separation) 2. Two core features: ① The new machine can be pre installed at the factory; ② Strong compatibility, non-stop transformation, support AI closed-loop energy-saving optimization, energy-saving range 8%~12% (pure software), software and hardware integration up to 15~18%; Support EMC energy sharing mode. 3. Advantages: Intelligentization is the original track, not the late add-on module; It can not only replace the new device, but also go to the blue shore alone to transform the old equipment; Support phased landing: AI suggested mode first and then closed-loop mode to minimize downtime
2026.11.05
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top