Can liquid oxygen be filled into the tower to shorten the start-up time of the air separation plant?

Can liquid oxygen be filled into the tower to shorten the start-up time of the air separation plant?
Jan 19, 2024
Author: DEAR AST
Question Reply

Air separation equipmentThe start-up includes three stages: cooling, hydrops and purification. For a certain equipment, the start-up time is roughly certain. For low voltageAir separation equipment,Air compressorThere is no room for adjustment of the pressure, generally depending on two setsExpanderWork at the same time to increase the refrigerating capacity in the start-up stage and shorten the start-up time. Even so, according to the maximum refrigeration capacity and the cooling required by cooling and Hydrops of the device, the start-up time of the device needs to be more than 36 hours.
Large air separation plantGenerally, liquid oxygen storage tanks are also equipped as emergency standby oxygen. If necessary, can liquid oxygen be filled into the tower to shorten the start-up time of the air separation plant? Theoretically, it is completely possible. For example, if 1 m is reversely charged to the main cold inside3Liquid oxygen, equivalent to providing 0.47 × 10 from the outside6The cooling capacity of kJ is about 5000 m3The refrigerating capacity of the expanded air in 2 H. Some factories have done tests, filling 20 m into the tower when starting3Liquid oxygen, for 6500 m3/H air separation plant can shorten the start-up time by 16.5 h; for 10000 m3/H air separation plant can shorten the start-up time by more than 8 hours.
Of course, when filling the tower with liquid oxygen, firstly, pay attention to the timing, and be sure to wait until the cooling of the unit starts to produce liquid in the main cooling, and then pour it inside, in order to avoid damaging the equipment due to thermal stress caused by excessive temperature difference; the second is to pay attention to the filling pressure. Because only higher than the tower bottom pressure can into liquid oxygen, but not more than liquid oxygen tank relief valve set pressure, to avoid relief valve action.

DEAR Air Separation Solve YourCan liquid oxygen be filled into the tower to shorten the start-up time of the air separation plant?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top