What are the steps for loading molecular sieves into molecular sieve purifiers in air separation equipment

What are the steps for loading molecular sieves into molecular sieve purifiers in air separation equipment
Sep 26, 2023
Author: DEAR AST

For users with external activation conditions, follow the following steps:

1) Firstly, thoroughly activate the molecular sieve to be filled and wait for filling;

2) Disassemble the air inlet pipe and filter pipe at the top of the purifier preparing to load the molecular sieve;

3) Load the activated molecular sieve into the container until it is full, and note the amount of molecular sieve filled. In order to fill tightly, a wooden hammer can be used to strike the head of the cylinder;

4) After installing the molecular sieve, reinstall the pipeline, filter tube, and valve. And it should be noted that the screws connecting the flange should be tightened evenly and symmetrically; The valve needs to be degreased and packed properly; The packing of the nitrogen heating valve should also be made of high-temperature resistant expanded graphite or asbestos wire.

For users without external activation conditions, the molecular sieve can be directly loaded into the purifier after removing the powder. The loading steps and precautions are the same as those in 2), 3), and 4) above, except that the newly replaced molecular sieve can only be used after regeneration in the device.

DEAR Air Separation has rich project engineering experience and continuously utilizes innovative technologies to optimize equipment energy conservation and safety. It is a major manufacturer and gas supplier of air separation equipment in China.

DEAR Air Separation Solve YourWhat are the steps for loading molecular sieves into molecular sieve purifiers in air separation equipmentYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
The skid mounting of equipment refers to connecting the pipelines, equipment, pumps, control cabinets, electrical instruments and other components of the complete set into a whole according to the designed process flow, and fixing them on an integral base through welding, bolting and other connection methods. Without site installation, it can be directly completed the mechanical and electrical integration installation of the whole set in the plant area, then transporting and hoisting will be convenient.
2024.05.15
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top