当前位置: Home / Faq / Air separation parts FAQ /

Why does the air separation equipment require inflation before starting the water pump when starting the air cooling tower

Why does the air separation equipment require inflation before starting the water pump when starting the air cooling tower
Sep 04, 2023
Author: DEAR AST

When the air cooling tower is put into use, pilot gas is required before starting the water pump. This is a measure to prevent air from carrying water. Because the pressure of the air inside the tower before inflation is atmospheric pressure, when high-pressure air with a pressure of about 0.5MPa (gauge pressure) is introduced into the tower, due to the expansion of the volume, the pressure will suddenly decrease, and the airflow speed will sharply increase. Its impact and entrainment effect is strong. At this point, if the cooling water has already been sprayed, it is easy for the air to carry water when leaving the cooling tower. Therefore, it is required to inflate the tower first, and then start the water pump to supply water and spray after the pressure increases and the airflow stabilizes.

Furthermore, if the water pump is turned on first, it is easy to cause the water level in the air cooling tower to be too high, even exceeding the elevation of the air inlet pipe, which increases the resistance of the air compressor outlet pipeline and causes the turbine air compressor to surge. Some equipment require that the circulating water pump can only be started after the pressure inside the air cooling tower exceeds 0.35MPa (gauge pressure). When the pressure drops below this value during operation, the water pump will automatically stop.

DEAR Company has technological advantages and engineering technicians with practical equipment operation experience operate and manage customers' equipment to ensure long-term, stable, and safe operation.

DEAR Air Separation Solve YourWhy does the air separation equipment require inflation before starting the water pump when starting the air cooling towerYou can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Why do the design, installation, and production of complete sets of air separation equipment require various parameters from the demand side?
2024.11.14
The classical single column process is the first one to be used in industrial application. However, there are many disadvantages in the classical single column process. One is that oxygen and nitrogen cannot be produced simultaneously, and the other is that the oxygen extraction rate can only reach about 70%. There are two improvement schemes to solve the defects of classical single column process. One is the curren...
2024.11.13
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top