当前位置: Home / Faq / Large air separation FAQ /

What are the configurations of the external compression process of the air separation unit

What are the configurations of the external compression process of the air separation unit
Sep 28, 2022
Author: DEAR AST

According to the requirements of oxygen consumption, the configuration of the external compression process of the air separation unit supporting the metallurgical and chemical industries is as follows:

1. Air compressor and filtering system: domestic or imported machines equipped with domestic self-cleaning filters;

2. Nitrogen water precooling system: make full use of the cooling capacity of dry nitrogen, reduce the temperature of chilled water, and cancel the chiller (or with standby chiller);

3. Purification system: electric heating or steam heating, automatic switching; Double layer bed structure of molecular sieve+alumina is adopted to prolong the service life of molecular sieve;

4. Refrigeration system: 2 domestic expanders, 1 for use and 1 for standby;

5. Heat exchange system: domestic low-pressure plate;

6. Main distillation system: sieve plate lower tower or packing lower tower, regular packing upper tower, plate fin multilayer or falling film main cooling;

7. Argon production system: regular packing argon tower, full rectification three tower argon production;

8. Oxygen pressure system: domestic oxygen permeation or oxygen piston;

9. Nitrogen pressure system: nitrogen permeation or nitrogen piston;

10. Instrument control system: domestic or imported DCS.

Advantages of external compression process: low supporting requirements, low price of supporting units or valves, and low investment.

DEAR Air Separation has a professional technical team to provide customers with high-quality design services in air separation equipment construction projects.

DEAR Air Separation Solve YourWhat are the configurations of the external compression process of the air separation unitYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Air cooling column start-up process
2026.07.10
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top