There are many valves in the air separation plant, and the following management and requirements are required for valve installation and maintenance.

Low temperature valves, valves on oxygen pipelines and valves in contact with oxygen medium must be free of oil, grease and any other impurities. When using, maintaining and repairing these valves, special attention should be paid to ensure that this point is not contaminated with oil, grease, wax and other flammable materials. If they have been in contact with oil, grease and other flammable materials, they should be degreased. The valve gasket, sealing packing and sealing ring must also be free of oil and grease, and must be made of non combustible materials suitable for oxygen valves. It is strictly forbidden to use oil-containing wax impregnation and combustible materials. The visible surface of the valve stem must be kept clean, and the surface of the valve stem should be regularly coated with a lubricant suitable for oxygen valves.

Check the leakage of the valve. Low temperature valves, oxygen pipelines and valves in contact with oxygen media must be cleaned and degreased strictly before installation. The solvents used for cleaning and degreasing must also be free of oil, grease and any other impurities. Decomposed solutions are not allowed. During the installation of valves, all solid substances such as slag, iron oxide scale, rust, welding slag, explosives (including grease, preservatives, etc.) must be removed from the installation of all valves.

In the process of equipment manufacturing and installation, DEAR air separation has detailed management and maintenance requirements for valves and special valves to ensure the high-quality operation of the equipment.

DEAR Air Separation Solve YourWhat are the management and requirements for valve installation and maintenance of air separation equipmentYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Before filling with pearlite, the water accumulated on the foundation surface of air separation unit must be removed, dried with hot air, and all manholes shall be closed. 2. When filling pearlite, all containers and pipes in the cold box should be inflated and kept at 50kPa pressure, then slightly open the valve of each meter pipeline, and all thermometers should be electrified to check whether the thermometer cable is damaged during the filling process. 3. The filled pearlite shall not be mixed with combustibles. 4. When filling with pearlite, coarse mesh or pearlite pouring device should be set at the manhole on the top of the cold box to prevent whole bag pearlite from entering the cold box. 5. After the pearlite is filled, the manhole shall be sealed.
2026.08.18
What is the oxygen extraction rate?
2026.08.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top