Precautions for orifice plate installation

Precautions for orifice plate installation
Jul 08, 2022
Author: DEAR AST

In order to ensure the reading accuracy of orifice flowmeter, the installation of orifice flowmeter should pay attention to the following points: the installation position of orifice should be in the straight pipe section, and there should be no protruding plastic, welding marks and dirt in the pipe with a distance of ten times the pipe diameter in front of the orifice and five times the pipe diameter behind the orifice. The installation direction of the orifice plate should not be mistaken, and the sharp edge of the inlet should correspond to the flow direction of the fluid; The center of the orifice plate must coincide with the center of the pipe. The orifice plates of different fluids cannot be installed incorrectly, because the coefficient K in the flow calculation formula is related to factors such as fluid density.

In June 2016, the fifth air separation plant KDON (AR) 30000/70000-900 of Kaifeng DEAR air separation plant for Hebei Anfeng iron and Steel Co., Ltd. was successfully started up at one time, and qualified oxygen and nitrogen products were successfully debugged. The output and purity of the products reached and exceeded the technical indicators required by the contract. After more than two months of normal operation, in September 2016, the argon system was put into operation and the argon indicators were tested to meet the standards, and the argon output was stable at 950nm ³/ H above, the purity is greater than 99.999%. Win users' praise again.

DEAR Air Separation Solve YourPrecautions for orifice plate installationYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
More than half of all air separation equipment accidents were the explosion caused by the main cooling system. When processing air, all the impurities which have not been completely removed will finally gather in the main cooling liquid oxygen.
2024.05.17
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top