In order to ensure the reading accuracy of orifice flowmeter, the installation of orifice flowmeter should pay attention to the following points: the installation position of orifice should be in the straight pipe section, and there should be no protruding plastic, welding marks and dirt in the pipe with a distance of ten times the pipe diameter in front of the orifice and five times the pipe diameter behind the orifice. The installation direction of the orifice plate should not be mistaken, and the sharp edge of the inlet should correspond to the flow direction of the fluid; The center of the orifice plate must coincide with the center of the pipe. The orifice plates of different fluids cannot be installed incorrectly, because the coefficient K in the flow calculation formula is related to factors such as fluid density.

In June 2016, the fifth air separation plant KDON (AR) 30000/70000-900 of Kaifeng DEAR air separation plant for Hebei Anfeng iron and Steel Co., Ltd. was successfully started up at one time, and qualified oxygen and nitrogen products were successfully debugged. The output and purity of the products reached and exceeded the technical indicators required by the contract. After more than two months of normal operation, in September 2016, the argon system was put into operation and the argon indicators were tested to meet the standards, and the argon output was stable at 950nm ³/ H above, the purity is greater than 99.999%. Win users' praise again.

DEAR Air Separation Solve YourPrecautions for orifice plate installationYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The liquid air separation plant system uses the cold energy to produce liquid oxygen, liquid nitrogen and liquid argon in an air separation system, including an air compression pre-cooling system, an air purification system, an air separation system and a nitrogen circulation system for liquid air separation plant cold recovery. the nitrogen circulation system for liquid air separation plant cold recovery is placed in a separate cold box from the main cold box of the air separation system. the l...
2026.08.03
In the process of operation, especially in the start-up and shutdown of the air separation unit, one-way force should be avoided on the instrument. During the start-up of the equipment, close the high pressure and low pressure valves firstly, then open the balance valve, and then slowly open the high pressure (or low pressure) valve, so that the measured medium can enter the positive (negative) pressure chamber of the transmitter. If the liquid is to be measured, the gas in the positive (negative) pressure chamber should be discharged from the upper vent. If the gas is measured, drain the liquid accumulated in the positive (negative) pressure chamber from the lower drain screw hole. After discharging the gas (liquid), close the balance valve, and then open the valve on the other side. When the equipment is shut down, the high pressure (or low pressure) valve should be closed first, then the balance valve should be opened, and then the valve should be closed on the other side. Someti
2026.07.31
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top