How does the Hampson liquid level meter measure the liquid level?

How does the Hampson liquid level meter measure the liquid level?
Jun 29, 2022
Author: DEAR AST

When replacing the working liquid in the liquid level meter, the positive and negative pressure inlet valves should be closed, and the equal pressure valve between the positive and negative pressure chambers should be opened so that the pressure difference between the two sides is zero, then the inlet cover should be opened to replace the liquid. Otherwise the working liquid inside the tube may be ejected under the action of the differential pressure. The type of working fluid contained inside should not be mistaken.
The liquid level gauge should be opened before the unit is started with the upper and lower valves. If used in operation, the upper valve should be opened first, followed by the lower valve, and the speed of opening the valve should be slow. When cryogenic liquid air, liquid oxygen and liquid nitrogen are led from a fractionating tower or storage tank by a conduit, they are bound to vaporise and the liquid level cannot be measured with an ordinary glass level meter, but must be measured with a special structured level meter, the principle of which is shown in Figure 116. It also uses the principle of hydrostatic pressure of the liquid.上海宝冶集团有限公司-7500(2)

DEAR Air Separation Solve YourHow does the Hampson liquid level meter measure the liquid level?You can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
The skid mounting of equipment refers to connecting the pipelines, equipment, pumps, control cabinets, electrical instruments and other components of the complete set into a whole according to the designed process flow, and fixing them on an integral base through welding, bolting and other connection methods. Without site installation, it can be directly completed the mechanical and electrical integration installation of the whole set in the plant area, then transporting and hoisting will be convenient.
2024.05.15
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top