Heating and thawing operation of fractionation column system of liquid air separation plants

Heating and thawing operation of fractionation column system of liquid air separation plants
Jun 08, 2022
Author: DEAR AST

The liquid air separation plant operates normally for about two years, and the fractionation tower system should be heated and thawed. Because the liquid air separation plant has been running for a long time, the low-temperature equipment and pipelines in the rectification system will be blocked due to the internal precipitation of ice or mechanical powder, resulting in an increase in the resistance of the fractionation tower. Therefore, it is necessary to warm and thaw the fractionator system to remove the precipitate.
Under normal circumstances, the heating and thawing operation is performed during normal shutdown: the liquid air separation plant must be drained after the normal shutdown. The dry air is introduced into the lower tower through the main heat exchanger, and all the liquid discharge valves of the lower tower are opened, so that the impurities accumulated in the main heat exchanger and the lower tower are heated and discharged out of the cold box after reheating. Open the liquid air throttling inlet valve V1 and the liquid nitrogen throttling inlet valve V3, introduce the heating gas into the upper tower, and open the upper tower blow-off valve according to the flow path for heating. Warming is complete when the inlet and outlet temperatures of the warmed gas are substantially the same.
DEAR Air Separation has long-term experience in the design, production and manufacture of liquid air separation plant, correctly analyzes the factors affecting the fractionation tower system, and makes corresponding theoretical guidelines for the operation, heating and thawing of the liquid air separation plant fractionation tower system.旋转-DSC03521

DEAR Air Separation Solve YourHeating and thawing operation of fractionation column system of liquid air separation plantsYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
How many adsorbers are there in the purification system of air separation equipment?
2024.04.30
At the installation site of the air separation plant, we may see a variety of operation methods. We may be a little surprised when we first see it. We may get used to it if we see it many times. However, many accidents are caused by our negligence and carelessness. The following are some common sense of safe construction, hoping to be helpful to everyone: 1. Workers must wear safety helmets correctly when entering the construction site, because the construction site is often chaotic. Some equipment installation site, several construction teams are constructing at the same time, it is impossible to completely guarantee that there is no falling objects. 2. Use personal protective equipment correctly, and seriously implement safety protection measures. Safety belts must be fastened when constructing on high places, cliffs and steep slopes without protective facilities. 3. It is forbidden to climb the scaffold, safety protection facilities, etc. It is strictly prohibited to take the ele...
2024.04.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top