当前位置: Home / Faq / Small air separation FAQ /

Main performance test of small air separation plant

Main performance test of small air separation plant
Jun 08, 2022
Author: DEAR AST

The standardized design of the assembly process all adopts the machine-made wire number, and is equipped with the "Small Air Separation Plant Control Box Wiring Process Instruction"
Standardized design of external wiring The requirements for external wiring of small air separation plants are divided into two types: when there is a large amount of wires and the diameter is thick, the wiring grooves are uniformly laid. When the amount of cables is small and the diameter is small, the threading pipes are uniformly used and the special joints and brackets are used for laying and fixing. A protective cover design is added to the original unprotected electrical parts of the small air separation plant. Special sheaths and connectors are used for the design of communication lines of instruments such as pressure transmitters.
Main performance tests and completion of the mission statement After the design and development of this set is completed, the technicians and quality inspectors have carried out tests on the small air separation plants one by one in strict accordance with the requirements of the product technical conditions and test standards, and all performances meet the technical performance and Requirements.
DEAR air separation energy-saving small air separation plant was successfully started and put into production to provide users with qualified products. After many years of operation, the current equipment is running stably, all indicators are better than the contract value, and it has been unanimously praised by customers!
旋转-DSC03522

DEAR Air Separation Solve YourMain performance test of small air separation plantYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top