Large air separation unit argon purification stage

Large air separation unit argon purification stage
May 13, 2022
Author: DEAR AST

The cooling of the argon system of the large air separation unit should be carried out simultaneously with the cooling of the main tower system. After the cooling of the argon system, even if the argon system is not put into operation, a certain amount of cold should be introduced to the argon system to keep the argon system always in a cold state. Argon system can choose to adjust the pure and the main tower at the same time, more appropriate to wait for the main tower system adjustment is normal and then adjust:

1, the process liquid argon pump must wait for the main tower system to be adjusted.

2, the process liquid argon pump must be to the bottom of the crude argon tower liquid level to reach the design of the liquid level before starting.

3, start the process liquid argon pump before the Ar condenser should retain a certain liquid level.

4, adjust the pure stage should first adjust the Ar purity and then adjust the Ar output.

5, crude argon tower I, II should be depending on the respective resistance value and argon fraction containing Ar gradually increase the load, at the same time must pay attention to the O2, N2 content of the gas pumped from the top of the crude argon tower II.

6, the valve should be depending on the crude argon gas containing O2, N2 amount gradually and slowly open large. Adjust the valve opening to control the resistance of the pure argon tower, at the same time to control the amount is not too large.

7, adjust the pure stage should first ensure that the main tower system purity is not damaged. The pure stage must pay close attention to the analysis value of each analysis point, depending on the specific situation to adjust.

8、The output of the Ar system must be changed with the change of the processing gas volume.

DEAR air separation small air separation units, large air separation units and liquid air separation plants manufacturing technology is mature and standardised to ensure safe operation and maintenance, stable and efficient production.

上海宝冶集团有限公司-7500(2)

DEAR Air Separation Solve YourLarge air separation unit argon purification stageYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Liquid air separation plant solutions Most liquid air separation plant cold energy receiving stations have a peaking role, their use is generally for domestic gas or car refuelling, with high and intermittent periods of gas consumption, for example 1-2 hour peaks in the morning and midnight. If the liquid air separation plant vapourisation plant is intermittent, the plant will not operate continuously. The solution is based on the intermittent use of liquid air separation plant and is character...
2026.07.08
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top