How to start the booster turbine expander for liquid air separation plant?

How to start the booster turbine expander for liquid air separation plant?
Aug 05, 2024
Author: DEAR AST

Steps to start the booster turbine expander for liquid air separation plants.

  1. Prepare the booster turbine expander for start-up in accordance with the requirements.
  2. The compressed air enters the lower tower in liquid air separation plant.
  3. High pressure air pressurised by the booster end of the booster turbine expander in liquid air separation plant, then cooled and throttled by the main heat exchanger into the lower tower; maintaining a lower tower pressure of around 0.35 MPa.
  4. The pressurised air (drawn from the middle of the main heat exchanger) going to the expander.
  5. Start the pressurised turbine expander and bring it gradually to full capacity operation.
  6. Pay attention to the speed of the expander and the air flow at the booster end during the opening of the expander nozzle, the air flow at the booster end can be adjusted by means of a valve.
  7. Keep the discharge pressure of the booster compressor stable.
  8. Disconnect and deactivate the backup instrument air source provided by the user and use the instrument air from the set itself instead.
  9. Adjustment of valves. All valve adjustments should be carried out step by step and slowly, when each operation has achieved the desired effect, before carrying out the next valve adjustment, do not operate too hard and too fast.
  10. Temperature control. Main heat exchanger group hot end temperature difference should be controlled within 3 ~ 3.5 ℃.
  11. The inlet temperature of the expander is controlled above -105°C to keep the booster expander running at high load.

DEAR Air Separation manufactures complete sets of small air separation units, large air separation units and liquid air separation plants and has had technical studies for many years to ensure safe and stable operation of the small air separation unit, large air separation unit and liquid air separation plant start-up.微信图片_20200217112035

DEAR Air Separation Solve YourHow to start the booster turbine expander for liquid air separation plant?You can also learn about otherHigh purity nitrogen air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
According to the daily water quality analysis and laboratory results, supplement the discharge water and control the dosing amount to make it reach the required data index. When the turbidity is >20mgL, increase the amount of drainage water, increase the flow of side filtration, and supplement clean water. According to the current situation of the circulating water system, try to increase the concentration multiple operation to save water and medicine. If the concentration multiplier is g...
2026.09.04
Before the air cooling columnand water cooling columnare hoisted in place, the anchor hole shall be cleaned, and there shall be no water and debris in the anchor hole.   After the air cooling columnand water cooling columnare hoisted in place, the perpendicularity of the equipment shall be checked. The perpendicularity shall be ≤ 1/1000 and the total length shall not exceed 10mm.   The bottom of the anchor bolt shall not touch the bottom of the reserved anchor hole. Af...
2026.09.03
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top