当前位置: Home / Faq / Large air separation FAQ /

Why does the large air separation units liquid drain valve not close?

Why does the large air separation units liquid drain valve not close?
Apr 15, 2022
Author: DEAR AST

The acetylene content in liquid air and liquid oxygen needs to be analysed every day, so the liquid air and liquid oxygen discharge valves have to be operated every day.

The problem arises when it is easy to open the valve, but difficult to close it, sometimes even a little can not be closed. This is mainly due to the presence of moisture at the valve stuffing box. When the liquid is discharged, the temperature drops and freezing occurs. In order to prevent this, the valve should be turned continuously at the beginning of the discharge of the liquid so that the stem does not freeze. If freezing has occurred, steam can be used to heat the stuffing box before it is closed.

Dear Air Separation has a lot of practical experience in all aspects of technology, piping and valves in the long-term small air separation units manufacturing and design process, requiring high quality large air separation units and liquid air separation plants and providing a full range of technical services to customers.

上海宝冶集团有限公司-7500(2)

DEAR Air Separation Solve YourWhy does the large air separation units liquid drain valve not close?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What is the enthalpy in the air separation plant?
2026.08.20
1. Before filling with pearlite, the water accumulated on the foundation surface of air separation unit must be removed, dried with hot air, and all manholes shall be closed. 2. When filling pearlite, all containers and pipes in the cold box should be inflated and kept at 50kPa pressure, then slightly open the valve of each meter pipeline, and all thermometers should be electrified to check whether the thermometer cable is damaged during the filling process. 3. The filled pearlite shall not be mixed with combustibles. 4. When filling with pearlite, coarse mesh or pearlite pouring device should be set at the manhole on the top of the cold box to prevent whole bag pearlite from entering the cold box. 5. After the pearlite is filled, the manhole shall be sealed.
2026.08.18
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top