There are 10 ways to transilluminate the welding seam of air separation unit, which are suitable for different occasions. Single wall is the most commonly used transilluminating method, but when the radiation source or film cannot enter the inside small diameter vessel and pipeline, double wall transilluminating method is adopted. The selection of transillumination method should consider all factors synthetically. For example, according to the principle of selecting the transillumination method which is beneficial and improves the sensitivity, single wall transillumination should be selected as far as possible. According to the principle which is conducive to the detection of corresponding defects, the outside radiation source is preferred for the detection of cracks on the inner wall of the container.

DEAR Air Separation Solve YourSelection of transilluminating method for welding seam of air separation unitYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
In the process of operation, especially in the start-up and shutdown of the air separation unit, one-way force should be avoided on the instrument. During the start-up of the equipment, close the high pressure and low pressure valves firstly, then open the balance valve, and then slowly open the high pressure (or low pressure) valve, so that the measured medium can enter the positive (negative) pressure chamber of the transmitter. If the liquid is to be measured, the gas in the positive (negative) pressure chamber should be discharged from the upper vent. If the gas is measured, drain the liquid accumulated in the positive (negative) pressure chamber from the lower drain screw hole. After discharging the gas (liquid), close the balance valve, and then open the valve on the other side. When the equipment is shut down, the high pressure (or low pressure) valve should be closed first, then the balance valve should be opened, and then the valve should be closed on the other side. Someti
2026.07.31
What are the reasons why the oxygen production of air separation equipment cannot meet the target
2026.07.30
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top