Switching valve (forced Valve) is a pneumatic switching valve installed on the hot end of switching heat exchanger (or cooler.Changeover valveThe switch is controlled by the signal compressed air through the solenoid valve. According to the different functions in the process, there are air, sewage and nitrogen switching valve, pure nitrogen suppression valve, sewage and nitrogen three-way valve, etc. It can be divided into vertical and horizontal structures. Vertical switch valve can be divided into air open type and Air closed type. Air open type means that when the signal compressed air is cut off, the valve flap can open automatically depending on its own weight; otherwise, it is gas closed type. The selection of gas on and off is determined by the safety of the device. Nitrogen switch valve uses air open type, air switch valve uses Air closed type.
Since the movement of the switch valve is controlled by the solenoid valve, in addition to the choice of open gas and closed gas to prevent the gas source failure from bringing harm, we should also pay attention to the coordination between the state of the solenoid valve and the state of the switch valve, so as not to endanger the safety of the equipment when the power supply fails. Now it is explained as follows:
1) sewage nitrogen switching valve. When the four-way solenoid valve has power, the switch valve is closed. When power loss occurs, the switch valve opens. And when the power supply loses power and the air source loses voltage, it can also be turned on by itself. So as to ensure that when the fault occurs, the gas in the upper tower can be emptied through the cooler, which will not cause overpressure.
2) AirChangeover valve. When the four-way solenoid valve has power, the switch valve opens. When power loss occurs, the switch valve is closed. When the power failure of the control power supply loses power, the switch valve closes; when the pressure loss of the control air source failure, the switch valve closes by its own weight to ensure that the raw material air does not enter the air separation tower when the failure occurs.
3) dirty nitrogen (pure nitrogen) three-way switch valve. Four-way solenoid valve electricity, tee changeover valve in row send position; four-way solenoid valve power lost, tee changeover valve in empty position. When the power failure loses power, the three-way switch valve is in the emptying position; when the gas source failure loses pressure, the three-way switch valve can be in the emptying position by its own weight.

DEAR Air Separation Solve YourWhat is switching valve? How does it work?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top