What safety matters should be paid attention to when checking pressure pipelines?

What safety matters should be paid attention to when checking pressure pipelines?
Mar 21, 2024
Author: DEAR AST
Question Reply

For the pipeline with pressure, the easiest problem in the production process is the leakage at the connection flange. Once leakage is found, do not tighten it under pressureBolt. There are some reasons for the leakage in the process of operation, such as gasket damage, pipeline under thermal stress, etc. At this time, just rely on twistingBoltIf the problem can not be solved, often screw the Bolt hard because the leakage has not been eliminated until the bolt is broken, and the high pressure gas in the pipe sprays out, causing injury accidents. There have been several factories that have broken bolts due to the screw bolts with pressure,FlangeLesson from the casualty accident of disc flying.
Therefore, it must be strictly abided by the forbidding of twisting with pressureBoltRules, do not hold fluke mentality in order to seize the time, hurry up with the task, violate the operating rules.

DEAR Air Separation Solve YourWhat safety matters should be paid attention to when checking pressure pipelines?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top