Before filling the molecular sieve, check that there is no leakage on the sieve bedMolecular sieveThe problem, otherwise it needs to be dealt. Oil and other sundries are not allowed in the tank; people who take part in the filling are not allowed to wear working shoes with nails in order to avoid stepping on the sieve bed; people should wear clean work clothes without oil. Several standard height marks should be made in the middle part, first check the ring chamber, and fill the aluminum glue to reach the standard height, then fill the molecular sieve. Due to the large amount of molecular sieves, the secondary output of molecular sieves in different kilns is generally different. Therefore, the molecular sieves of the same batch of kilns should be evenly filled with two molecular sieves. After the filling is completed, use the flattening mechanism to flattening first, and check whether the filling of the molecular sieve reaches the standard height (the molecular sieve has been buried below in the ring room ). The molecular sieve shall be leveled again until the molecular sieve on the sieve bed is leveled and there is no concave-convex problem. After checking that there is no problem, it can be considered that the filling work is over.
For users with external activation conditions, follow the following steps:
1) first, completely activate the molecular sieve to be filled and wait to be filled;
2) dismantle the air inlet pipe and filter pipe on the top of the purifier which is ready to fill the molecular sieve;
3) load the activated molecular sieve into the container until it is filled, and note down the number of the molecular sieve filled. In order to fill dense, wooden hammer can be used to knock on the head of the barrel;
4) after the molecular sieve is installed, put it back to the pipeline, filter pipe and valve. And attention should be paid: the screws connecting the flange should be tightened evenly and symmetrically; the valve should be filled with stuffing after degreasing; the stuffing of nitrogen heating valve should also use high temperature resistant expansion graphite or asbestos wire.
For users who don't have the Activation condition outside the device, the powder can be sifted from the molecular sieve and directly put into the filling purifier. The filling steps and matters needing attention are the same as those of the above 2), 3) and 4, the difference is that the new molecular sieve can only be used after regeneration in the device.

DEAR Air Separation Solve YourHow to fill the molecular sieve of the molecular sieve purifier?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top