Test process of stainless steel pipe in air separation unit
2024.12.20
Pressure swing adsorption and temperature swing adsorption of molecular sieve
2024.12.19
What is the function of the distillation tower in air separation equipment?
2024.12.18
If the air temperature in the small air separation unit expander is lower than the liquefaction temperature corresponding to the local pressure, part of the gas will liquefy and droplets will appear in the expander. However, the rotating speed of the working wheel of the turbo expander is very high, and the droplet impact on the impeller will cause the impeller surface wear. The droplets may also be thrown to the gap ...
2024.12.17
Almost all motors commonly used in the air separation plant are three-phase AC motors. Three-phase AC motor can be divided into asynchronous motor and synchronous motor. The rotating speed of the synchronous motor and the frequency of the power grid keep a strict relationship, namely: N = 60f/P in the formula P -- magnetic pole logarithm; f -- grid frequency, the normal situation is 50Hz; n -- motor speed, r/min. For example, for two-pole (P = 1) synchronous motor, the synchronous speed is 3000r/min; for four-pole motor, P = 2, n = 1500r/min. While the rotating speed of asynchronous motor is always less than that of synchronous motor, and it generates rotating torque by its phase difference. Asynchronous motor is most widely used. It consists of a stator and a rotor, and has a stator and a rotor winding respectively. The stator winding is made of copper (aluminum) wire with outsourcing insulation. With the difference of rotor winding, asynchronous motor can be divided into squirrel ...
2024.12.16
Adsorption and purification of air
2024.12.13
How does the throttling effect of air separation equipment generate refrigeration capacity?
2024.12.12
1. The requirements of molecular sieve adsorber, electric heater and other equipment in place are the same as those of air cooling column of pre cooling system. 2. Process piping shall be constructed in strict accordance with relevant specifications and design and construction drawings. 3. The air tightness test shall be conducted before the valve is installed, and the test pressure and inspection standard shall be carried out according to the technical requirements of corresponding valves. 4. Pay attention to the direction of switch valve installation. V1201, V1202, V1207 and V1208 are front mounted valves, while V1203, V1204, V1205 and V1206 are reverse mounted valves. When the switch valve is installed, its shaft should be in a horizontal position, and the flange bolts should be evenly cross tightened. 5. The pipeline of pressure equalizing valve V1209 should have compensating bend.
2024.12.11
If you experience problems with your air separation device, you can also contact us via live chat or email.
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top