After entering the summer solstice, each production workshop ushered in the production peak again. The KDON (Ar)-1500 40Y/1500/40 Y air separation set of Burma Iron and Steel Company had a tight schedule, the delivery time of various heat exchanger, oxygen compressor and auxiliary equipment, air storage tank, upper tower, argon Tower and other products is concentrated, and the overall production task is very heavy. Meanwhile, the weather continues to be hot and hot, it brings great difficulties and severe tests to the front-line employees of production. The front-line employees of the company carry forward the spirit of Dauntless, fight against high temperature and heat, and work hard on their own production and working positions.
The fire flowed on July. It is hot and geothermal, but the heart of workshop staff is hotter. In the face of difficulties, the majority of employees are still in high spirits and their work enthusiasm has not been reduced at all. The welders and cold workers in the production line worked hard and sweated heavily. The employees of other types of work went all out to cooperate and had no complaints about the employees who worked overtime. They all put the guarantee of timely delivery of contract products in the first place; all the work of production management personnel is pushed to the front line of workshop, scheduling, coordinating production, checking and implementing the production schedule of the day, and ensuring that the task is completed on the same day.
Although the weather is hot and the tasks are heavy, the employees' requirements for work and quality are not "shrunk" at all. They are meticulous, careful and more attentive in work. They always keep a good mental state and remind themselves that the more they work under high temperature, the more clearly they need to keep a clear head and the more rigorous their work style is. They did every process carefully and carefully, and completed every task with good quality and quantity. Every staff in the quality control department keeps their eyes on the scene with quality in their hearts. They should strengthen on-site management, pay attention to every detail carefully, prevent from slight changes, pay attention to quality and ensure safety, contribute to the stable production of the company. Especially for the manufacture of the upper tower and argon tower of the plate welding plant, during the process of filling and assembling the inner parts, the leaders of the company come to the site to supervise and guide the production, inspectors are more meticulous, careful and meticulous to conduct a comprehensive inspection of the filling quality of each layer of stuffing. With the concerted efforts of everyone, the assembly quality of the upper tower and argon Tower was well received by the on-site supervisor.
The high temperature of war and the hot summer show the dedication spirit of the staff of DEAR who work hard and bravely. Although the temperature was high, the employees had higher enthusiasm and fighting spirit. They caught up with the construction period and did not forget to grasp the quality. They proved that the employees of DEAR were a team that dared to fight hard and could fight hard with practical actions.
The matching argon Tower stuffing site of 1500 air separation plant in Burma
Supported argon Tower stuffing assembly for Burma 1500 air separation plant
The first-line welders produced in high temperature and hot summer are full of energy