What are the operating procedures for starting the expansion machine of the air separation equipment?

What are the operating procedures for starting the expansion machine of the air separation equipment?
May 06, 2024
Author: DEAR AST

The operating procedures for starting the expansion machine include the following aspects:
Input various measuring instruments into the system; Start the sealing gas and oil system; Check the valve status and ensure that it is fully open manually when opened; Put the aftercooler at the booster end of the expander into operation; The cooling water of the oil cooler should be put into operation when it is about to start up, and the oil temperature should not be too low; When the booster reaches the specified required value after a section of boosting, start the expander, and then quickly open the nozzle to make the expander quickly and smoothly pass the critical speed; Slowly open the nozzle to 70% (or more), then slowly close the reflux valve until it is fully closed, gradually increasing the speed to the rated speed; During the start-up of the expander, attention should be paid to the control of BAC to ensure that the exhaust pressure in one section remains relatively stable; As the inlet temperature of the expander decreases, the amount of air flowing through the expander gradually increases. It is important to pay attention to the changes in speed by adjusting the nozzle to adjust the speed; During operation, attention should be paid to monitoring the temperature of the expander bearings and controlling the oil temperature.
DEAR Air Separation specializes in the research and development, manufacturing, and installation of various complete sets of air separation equipment, providing customers with efficient engineering and technical solutions.

DEAR Air Separation Solve YourWhat are the operating procedures for starting the expansion machine of the air separation equipment?You can also learn about otherHigh purity nitrogen air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What precautions should be taken when designing a complete set of air separation equipment?
2024.11.22
In case of sudden power failure during the operation of small air separation unit, the following steps should be followed:   First, open the vent valve (anti surge valve) of air compressor to prevent the air compressor from surging and causing the air compressor to reverse due to air backflow;   Then check whether the molecular sieve adsorber switch should be interlocked to close, if not, it should be man...
2024.11.21
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top