当前位置: Home / Faq / Air separation parts FAQ /

Relationship between the average temperature of liquid oxygen in an air separation plant and the main cooling liquid level

Relationship between the average temperature of liquid oxygen in an air separation plant and the main cooling liquid level
Mar 21, 2023
Author: DEAR AST

The average temperature of liquid oxygen is related to the level of the main cooler. The higher the level of liquid oxygen in the main cooler, the higher the pressure of liquid oxygen at the bottom of the main cooler, and the higher the evaporation temperature of liquid oxygen. Since liquid oxygen is in a saturated state, the average temperature of liquid oxygen will increase. At this time, if you want to maintain the main cooling temperature difference, you must correspondingly increase the lower tower pressure. Therefore, considering the design, the pressure on the liquid oxygen surface should not be too high. Generally, the height of small and medium-sized air separators is 0.4~0.5m, and the height of large air separators is 1.2~1.8m.

DEAR Air Separation has strong scientific research strength and design foundation in the field of gas technology, and has made outstanding achievements in technical research and product development.

DEAR Air Separation Solve YourRelationship between the average temperature of liquid oxygen in an air separation plant and the main cooling liquid levelYou can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top