What should be paid attention to during hot welding of air separation equipment maintenance

What should be paid attention to during hot welding of air separation equipment maintenance
Dec 14, 2022
Author: DEAR AST

After long-term operation of the air separation plant, when the oxygen generator of the air separation plant is shut down for maintenance and hot work is required for welding, the following aspects shall be paid attention to:

1. If open fire is required in the oxygen generator workshop, it shall be approved by the superior, and the oxygen concentration around the site shall be tested to strengthen fire fighting measures. When the oxygen concentration in the welding site is higher than 23%, welding is not allowed. When the oxygen concentration is lower than 19%, asphyxiation accident shall be prevented;

2. Vessels with air pressure shall not be welded before pressure relief;

3. It is not allowed to repair low temperature vessels without thorough heating to avoid excessive thermal stress or failure to ensure welding quality. In serious cases, if liquid oxygen and gaseous oxygen leak out, it may also cause fire;

4. The whole process of hot work shall be monitored by the safety officer.

The production technology of DEAR air separation plant is mature and standardized to ensure safe production, operation and maintenance, stable and efficient operation. The professional training lecturer of Deer Air Separation Company escorts customers. How to let customers get familiar with the equipment as soon as possible, and how to operate correctly and reasonably is crucial. Comprehensively use the knowledge and experience of engineering technology to ensure that each link is executed in place and handled carefully, so that customers can rest assured and satisfied.

DEAR Air Separation Solve YourWhat should be paid attention to during hot welding of air separation equipment maintenanceYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. The removal of perlite site shall be supervised by full-time personnel and guided by professionals. The principle of who organizes, who takes responsibility shall be followed. There should be a safe passage and a warning line at the removal of perlite site, and it is strictly forbidden to enter. 2. Dry air shall be used to warm the sand during the removal and knock the cold box to remove the pearlite caking, so as to prevent equipment damage caused by falling caking. 3. The removal of perlite should be carried out in layers and sand holes should be opened at different heights of the cold box. (It can be adjusted according to the site conditions) 4. In the process of removal of perlite, always supervise the caking on the top and enter the cold box for cleaning at any time. 5. In case of severe weather such as rain, snow, strong wind or sand storm danger, the construction party and the owner shall jointly confirm that the sand stripping work shall be postponed. 6. Remov
2025.04.18
How to check if the cooling water circulation of the air separation equipment is fully connected?
2025.04.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top