Temporary stopping steps for large air separation plants

Temporary stopping steps for large air separation plants
Jun 15, 2022
Author: DEAR AST

When the large air separation unit needs to be temporarily stopped due to various faults, the following steps are to be followed.
Stop the operation of each product compressor; stop the operation of the booster turbine expansion unit; stop the operation of the medium-pressure liquid oxygen pump; stop the operation of the medium-pressure liquid argon pump; stop the operation of the booster compressor unit; switch the instrument air system to the standby pipeline; open the air turbine compressor outlet venting valve; open the product venting valve appropriately and close the product delivery valve; cut off the pipeline conveying the lower tower liquid air to the upper tower and the argon making part; stop the operation of the air turbine compressor. Shut down the air pre-cooling system; shut down the switching system of the molecular sieve purifier system.
The entire liquid shall be discharged when one of the following conditions occurs.
1. When the content of acetylene and other pure hydrocarbons in the main condensing evaporator liquid starts to exceed the normal operating value, the discharge of the liquid should be considered, and when the content of these impurities reaches the alarm value, the main cooling liquid should be discharged in its entirety.
2. When the liquid level in the main condensing evaporator drops to 50% of the normal operating level, the main cold liquid should be discharged in its entirety.
DEAR air separation in the normal large air separation unit temporary stopping process, there are standardized step requirements, and also to closely monitor the individual equipment pressure, can not overpressure.

旋转-DSC03521

DEAR Air Separation Solve YourTemporary stopping steps for large air separation plantsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
How many adsorbers are there in the purification system of air separation equipment?
2024.04.30
At the installation site of the air separation plant, we may see a variety of operation methods. We may be a little surprised when we first see it. We may get used to it if we see it many times. However, many accidents are caused by our negligence and carelessness. The following are some common sense of safe construction, hoping to be helpful to everyone: 1. Workers must wear safety helmets correctly when entering the construction site, because the construction site is often chaotic. Some equipment installation site, several construction teams are constructing at the same time, it is impossible to completely guarantee that there is no falling objects. 2. Use personal protective equipment correctly, and seriously implement safety protection measures. Safety belts must be fastened when constructing on high places, cliffs and steep slopes without protective facilities. 3. It is forbidden to climb the scaffold, safety protection facilities, etc. It is strictly prohibited to take the ele...
2024.04.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top