Temporary stopping steps for large air separation plants

Temporary stopping steps for large air separation plants
Jun 15, 2022
Author: DEAR AST

When the large air separation unit needs to be temporarily stopped due to various faults, the following steps are to be followed.
Stop the operation of each product compressor; stop the operation of the booster turbine expansion unit; stop the operation of the medium-pressure liquid oxygen pump; stop the operation of the medium-pressure liquid argon pump; stop the operation of the booster compressor unit; switch the instrument air system to the standby pipeline; open the air turbine compressor outlet venting valve; open the product venting valve appropriately and close the product delivery valve; cut off the pipeline conveying the lower tower liquid air to the upper tower and the argon making part; stop the operation of the air turbine compressor. Shut down the air pre-cooling system; shut down the switching system of the molecular sieve purifier system.
The entire liquid shall be discharged when one of the following conditions occurs.
1. When the content of acetylene and other pure hydrocarbons in the main condensing evaporator liquid starts to exceed the normal operating value, the discharge of the liquid should be considered, and when the content of these impurities reaches the alarm value, the main cooling liquid should be discharged in its entirety.
2. When the liquid level in the main condensing evaporator drops to 50% of the normal operating level, the main cold liquid should be discharged in its entirety.
DEAR air separation in the normal large air separation unit temporary stopping process, there are standardized step requirements, and also to closely monitor the individual equipment pressure, can not overpressure.

旋转-DSC03521

DEAR Air Separation Solve YourTemporary stopping steps for large air separation plantsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top