Site construction requirements for chillersn in liquid air separation plant

Site construction requirements for chillersn in liquid air separation plant
Sep 09, 2025
Author: DEAR AST

The site should be carefully checked for the chiller type and evaporator design pressure. It is not possible to use the water inlet as a water outlet and vice versa: the water flow switch is determined to be installed.

The first start-up must be carried out under the guidance of the chiller plant manufacturer's personnel. Do not power on the chiller without permission. The installation requirements of the chiller plant are reflected in the operating instructions and the chiller plant manufacturer's personnel will be sent to the site to guide the installation in liquid air separation plant.

 

Site of liquid air separation plant plan layout, piping system configuration in accordance with GB16912-2008 "Deep freezing method for the production of oxygen and related gases safety technical regulations" in line with GB50058-92 "design specifications for electrical installations in explosive and fire-hazardous environments" liquid level design, the

Liquid level regulator insulation: there should be steam or electric heating with heat insulation measures air-cooled tower, water-cooled tower inlet pipe should have a gas seal, in order to waterproof backflow, the height of the gas seal to the requirements prevail. Water pump inlet and outlet pipes set up the necessary support pipe frame to prevent vibration caused by the pump inlet and outlet flange pulling crack.

Air outlet pipe of liquid air separation plant: and pipeline welding must be primed with argon arc welding before welding, so as to avoid welding slag in the air cooling tower screen defoamer screen burned.

Dear air separation of the pipeline flaw detection technology: the use of non-destructive testing air pipeline welds ≥ 250mm, 100% ray inspection, in line with JB / T4730-2005 "non-destructive testing of pressure equipment" requirements, the rest for surface non-destructive testing, and in line with the JB / T4730 provisions of Class 1 requirements.

11

DEAR Air Separation Solve YourSite construction requirements for chillersn in liquid air separation plantYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Liquid air separation plant solutions Most liquid air separation plant cold energy receiving stations have a peaking role, their use is generally for domestic gas or car refuelling, with high and intermittent periods of gas consumption, for example 1-2 hour peaks in the morning and midnight. If the liquid air separation plant vapourisation plant is intermittent, the plant will not operate continuously. The solution is based on the intermittent use of liquid air separation plant and is character...
2026.07.08
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top