All pressure vessels, valves and piping of small air separation unit and large air separation plant as well as the vicinity of the piping (in contact with oxygen or cryogenic media) must be clean, dry and free from oil and grease before installation. air separation unit which has been degreased by the manufacturer and is not contaminated can be installed without degreasing; if it is contaminated with grease, it should be degreased.

materials such as aluminium and magnesium, requirements: pH ≤ 10 for aluminium and magnesium parts, cleaning temperature 70 a 80°C. After cleaning with alkali solution, the parts should be rinsed with clean water until there is no residual alkali, and then dried.

Before installation and useage, oxygen piping should be blown clean of residues in the piping with oil-free dry air or nitrogen until it is free of rust, dust and other dirt. Blowing speed should be greater than 20m/s. Where the surface of the parts in contact with oxygen and the surface of the parts in operation where the residual oil may be carried to oxygen, the residual oil of the grease shall not exceed 125mg/m2, it is strictly forbidden to blow the pipeline with oxygen.

01

DEAR Air Separation Solve YourHow to clean vessels, valves and piping of large air separation plant?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for the design of piping in the cold box of liquid air separation plant? The design of piping in the cold box ofiquid air separation plant is complex and troublesome, and each pipeline has its own process requirements. As one of the most complex components in the cold box of air separation equipment, low temperature piping is the key to ensure the stable and safe operation of small air separation unit. A set of air separation equipment in the cold / hot end of the plat...
2025.05.15
1. Before hoisting, check and confirm whether the crane body, crane legs, lifting rigging and wire rope meet the safety requirements and hoisting conditions. 2. The hanging points of hoisting facilities shall be confirmed to prevent deviation and inclination; steel wire rope or sling shall be used for protection of edges and corners; sling and U-ring shall be used for lifting objects. 3. The commander shall use inter-phone for command, and special personnel shall be assigned for command, and the personnel shall stand at the position where the lifting object can be fully observed; warning isolation shall be set up in the hoisting area, and no one shall stand under the lifting object. 4. For large-scale hoisting, the hoisting safety scheme shall be formulated in combination with the company's special operation system.
2025.05.14
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top