Isothermal throttling refrigeration in large air separation plant

Isothermal throttling refrigeration in large air separation plant
Jan 10, 2022
Author: DEAR AST

Air can be reduced in temperature by throttling in large air separation plant, isothermal throttling is an isoenthalpy process and does not produce cooling. If the gas is to be cooled by isothermal throttling, it is compressed by isothermal compression and expanded by throttling. The enthalpy of the gas decreases during isothermal compression and the work of the compressor and the enthalpy drop of the gas are transferred to the environment together as heat. The isothermal compression gives the gas the ability to cool down and the throttling expansion makes this ability manifest.

 

Dear Air Separation has an attentive 100+ online consulting service team that can provide all services to customers anytime and anywhere. Whether you are in China or somewhere in the world, you can contact us at any time. Dear Air Separation has built up a team of over 100 online consultants to serve you 24/7, 365 days a year.

朱克嘉-凌云(缅甸1500)

DEAR Air Separation Solve YourIsothermal throttling refrigeration in large air separation plantYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What requirements and regulations should be met for the assembly of meter tube, cold insulation box and strength and air tightness test before positioning of air separation equipment
2025.01.08
1. According to the specific situation of the construction, formulate the fire protection scheme, establish and improve the fire safety system, and strictly abide by the operation rules. 2. Flammable and explosive materials such as paint and thinner shall not be stored in the project site. 3. The construction unit is not allowed to set up seasoning room in the project, and is not allowed to carry out paint allocation in the project. 4. No smoking is allowed in the construction site. A fire permit shall be issued and a special person shall be assigned to supervise the operation. 5. The operation site should be equipped with sufficient fire-fighting equipment. 6. During the construction period, the use of various open fire operations in the project shall be approved by the safety and environmental protection department of the construction unit, and sufficient fire-fighting materials and fire-fighting equipment shall be provided.
2025.01.07
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top