Centrifugal compressor, sometimes suddenly produce strong vibration in the production process, gas medium flow and pressure also appear substantial pulsation, and accompanied by periodic dull "call" sound, as well as airflow fluctuations in the network caused by "huffing" "huffing" strong noise, this phenomenon is known as the centrifugal compressor wheezing conditions in small air separation unit.

According to the production experience, Dear Air Separation finds the cause of the development of anti-surge specific methods, part of the gas venting method, part of the gas reflux method, change the compressor operating speed method.

纯氮空分设备 (3)

DEAR Air Separation Solve YourPreventive measures of centrifugal compressor in small air separation unitYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The liquid air separation plant system uses the cold energy to produce liquid oxygen, liquid nitrogen and liquid argon in an air separation system, including an air compression pre-cooling system, an air purification system, an air separation system and a nitrogen circulation system for liquid air separation plant cold recovery. the nitrogen circulation system for liquid air separation plant cold recovery is placed in a separate cold box from the main cold box of the air separation system. the l...
2026.08.03
In the process of operation, especially in the start-up and shutdown of the air separation unit, one-way force should be avoided on the instrument. During the start-up of the equipment, close the high pressure and low pressure valves firstly, then open the balance valve, and then slowly open the high pressure (or low pressure) valve, so that the measured medium can enter the positive (negative) pressure chamber of the transmitter. If the liquid is to be measured, the gas in the positive (negative) pressure chamber should be discharged from the upper vent. If the gas is measured, drain the liquid accumulated in the positive (negative) pressure chamber from the lower drain screw hole. After discharging the gas (liquid), close the balance valve, and then open the valve on the other side. When the equipment is shut down, the high pressure (or low pressure) valve should be closed first, then the balance valve should be opened, and then the valve should be closed on the other side. Someti
2026.07.31
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top