How to prevent water ingress accidents in large air separation plant?

How to prevent water ingress accidents in large air separation plant?
Jan 06, 2022
Author: DEAR AST

Water ingress can have the following phenomena: molecular sieve pressure fluctuates from high to low, the resistance of the adsorber rises, and the temperature profile changes after heating and cold blowing. The most obvious change is a drop-in temperature after cold blowing and the appearance of a flat-headed peak. The longer the distance between the curves of the flat-head wind, the more water is fed into the molecular sieve in large air separation plant.

 

Measures to prevent water intake in molecular sieve purification system: air-cooled tower should be operated according to the protocol, first ventilation, to wait for the pressure to rise and stabilise before passing a large amount of air; can not suddenly increase or reduce the amount of air; maintain the air-cooled tower water level; water spraying volume can not be too large; water quality should meet the requirements, reduce the temperature of the incoming water, and reduce scale.

主图

DEAR Air Separation Solve YourHow to prevent water ingress accidents in large air separation plant?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top